Planning Permission Ireland
RefusedEnergyDecided 20 February 2025

Country Crest, Collinstown, Lusk, Co. Dublin

Development of a large anaerobic digestion facility to produce renewable biomethane gas.

F24A/1162E · Fingal County Council · Lodged 18 December 2024

Reference
F24A/1162E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
18 December 2024

Summary

AI-generated

The development consists of an Anaerobic Digestion facility on a 7.28-hectare site to produce renewable biomethane gas for direct injection into the national grid. The infrastructure includes digestion tanks, feedstock storage, silage clamps, and carbon dioxide capture equipment for reuse in the food industry.

Energybiogasrenewable energyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development of an anaerobic digestion (ad) facility to produce a renewable biomethane gas for direct injection into the national gas grid on a site of circa 7.28 hectares at the townland of collinstown, lusk, co dublin. The development comprises of ad tanks and processing equipment, feedstock storage facilities and equipment, silage storage clamps, digestate management and storage facilities. Carbon dioxide from the production of this biomethane will be captured for reuse in the irish food industry. The proposed supporting infrastructure to be developed includes inter alia, 1 no. 45m diameter combined primary and secondary digestion tank (8.5m high, 7947m³ & 3981m³ respectively) & attached pumping unit, 1 no reception tank (5m high, 250 m³) & attached pumping unit, 1 no. 32m diameter power digest tank & attached gas sphere (12m high, 4.825m³ & 3130 m³ respectively) & attached pumping unit, 1 no. Digestate separator building (119.5 m2), 1 no. Pasteurization unit & hygenization buffer tank, 1 no. Gas upgrading unit, 1 no. Gas pre-treatment unit, 1 no. Gas valve chamber, 1 no. Gas flare (9m high), 1 no. Gni gas injection unit (25.1 m2) with an underground gas pipeline to the gas grid connection adjacent the site to the west, 1 no. Combined heat and power unit, 2 no. Boiler containers, 1 no. Oxygen compound, 1 no. Heat distribution container, 1 no. Switchboard container, 1 no. Carbon dioxide liquefaction unit, 2 no. Weighbridges & integrated lever arms & access control & attached bio security units, 1 no. Single-storey office and administration building (123 m2), 1 no. Esb sub-station (66 m2), 1 no. Enclosed feedstock reception building (1527 m2), 1 no. Odour abatement machinery (with 14m high chimney), silage clamps (8m high), 1 no. Machinery shed (309.4 m2), 1 no. Services building (288.6 m2), 1 no. Solid digestate storage building (484.1 m2), 2 no. Covered digestate lagoons, attached pumping building (30 m2) and attached digestate loading-unloading areas, roof mounted solar arrays / photovoltaic panels, all associated car and bicycle parking, internal road layouts, earthen berms, site retaining walls, palisade fencing and boundary treatments, hard surface and bunded areas for housing supporting plant, processing and storage facilities and all associated site works. All accessed by the existing country crest internal road network which uses as public roadway access point to the l1155 man o war road. The facility requires an industrial emissions licence from the epa and is accompanied by a natura impact statement (nis) and an environmental impact assessment report (eiar).

Land-use zoning

What this land is zoned for

RU - RuralRU
Protect and promote in a balanced way, the development of agriculture and rural related enterprise, biodiversity, the rural landscape, and the built and cultural heritage

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received18 December 2024
  2. Decision due20 February 2025
  3. Decision issued20 February 2025
  4. Appeal submitted19 March 2025
  5. Appeal decided13 May 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.