Cappanihane, Bruree, Co. Limerick
Construction of an anaerobic digestion facility to produce biomethane in Bruree.
2560239 · Limerick County Council · Lodged 24 March 2025
- Reference
- 2560239
- Authority
- Limerick County Council
- Register status
- Appealed
- Type
- PERMISSION
- Received
- 24 March 2025
Summary
AI-generatedThe proposed development is for an anaerobic digestion facility to produce renewable biomethane, captured CO2, and bio-based fertiliser. The facility will have a gross floor area of approximately 5,903 square metres and will include digester tanks, a feedstock reception building, and processing plant.
- Floor area
- 5,903 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- The construction of an anaerobic digestion facility to produce renewable biomethane, co2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq. M. The development will consist of the following
- Construction of 2 no. Primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (gfa) of c. 279.8 sq. M), and 2 no. Post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site
- Construction of 2 no. Prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site
- Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks
- Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a gfa of c. 2,797.2 sq. M) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site
- Construction of combined heat and power (chp) unit (c. 2.6m in height and c. 5.6m in height to flue, with a gfa of c. 38.53 sq. M), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a gfa of c. 12.74 sq. M), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site
- Construction of a co2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. Propane tanks (c. 1.6m in height), and an esb substation (with a gfa of c. 23.5 sq. M and a height of c. 3.4m), located in the south-eastern section of the site
- Construction of roofed silage clamps (with a gfa of c. 2,424 sq. M and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site
- Construction of a two storey office building (with a gfa of c. 327.4 sq. M and a height of c. 11m) within the western section of the site, adjacent to the site entrance
- Alterations to the adjacent local road including a new site entrance and access arrange
Key dates
Timeline
- Application received24 March 2025
- Decision due18 May 2025
- Decision issued14 May 2025
- Appeal submitted10 June 2025
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Ballyvass , Castledermot , Co. Kildare
2560920KildareLodged 12 Aug 2025
- GrantedEnergy
Construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6…
Former Lisheen Mine Site , Killoran Moyne , Thurles Co. Tipperary
2460936TipperaryLodged 2 Nov 2024
- Awaiting decisionEnergy
A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2…
Thornhill and Annaholty , Birdhill , Co Tipperary
2560984TipperaryLodged 2 Oct 2025
- GrantedEnergy
The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of…
Corracunna, Coolnanave Garrane Mitchelstown Co. Cork
24/6272corkLodged 2 Dec 2024
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
- Awaiting decisionEnergy
RED III application for development which comprises the construction of an anaerobic digestion facility to…
Ballynilard , Tipperary , Co. Tipperary
2660031TipperaryLodged 19 Jan 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.