RefusedEnergyDecided 14 May 2025

Cappanihane, Bruree, Co. Limerick

Construction of an anaerobic digestion facility to produce biomethane in Bruree.

2560239 · Limerick County Council · Lodged 24 March 2025

Reference
2560239
Authority
Limerick County Council
Register status
Appealed
Type
PERMISSION
Received
24 March 2025

Summary

AI-generated

The proposed development is for an anaerobic digestion facility to produce renewable biomethane, captured CO2, and bio-based fertiliser. The facility will have a gross floor area of approximately 5,903 square metres and will include digester tanks, a feedstock reception building, and processing plant.

Energybiogasrenewablesagriculture
Floor area
5,903 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The construction of an anaerobic digestion facility to produce renewable biomethane, co2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq. M. The development will consist of the following
  • Construction of 2 no. Primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (gfa) of c. 279.8 sq. M), and 2 no. Post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site
  • Construction of 2 no. Prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site
  • Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks
  • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a gfa of c. 2,797.2 sq. M) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site
  • Construction of combined heat and power (chp) unit (c. 2.6m in height and c. 5.6m in height to flue, with a gfa of c. 38.53 sq. M), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a gfa of c. 12.74 sq. M), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site
  • Construction of a co2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. Propane tanks (c. 1.6m in height), and an esb substation (with a gfa of c. 23.5 sq. M and a height of c. 3.4m), located in the south-eastern section of the site
  • Construction of roofed silage clamps (with a gfa of c. 2,424 sq. M and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site
  • Construction of a two storey office building (with a gfa of c. 327.4 sq. M and a height of c. 11m) within the western section of the site, adjacent to the site entrance
  • Alterations to the adjacent local road including a new site entrance and access arrange

Key dates

Timeline

  1. Application received24 March 2025
  2. Decision due18 May 2025
  3. Decision issued14 May 2025
  4. Appeal submitted10 June 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.