Planning Permission Ireland
Awaiting decisionInfrastructureDecision due today (23 July 2026)

Lands primarily public roads (R104, M50, R108) between the existing Poppintree 110kV substation on a site to the south of St. Margaret’s Road (R104) in the townland of Ballymun, Co. Dublin and a site to the south of the Old Airport Road (L2015)

Construction of a 3.7 km underground medium voltage cable and two 20kV substations between Ballymun and Ballystraun.

F26A/0453E · Fingal County Council · Lodged 26 May 2026

Reference
F26A/0453E
Authority
Fingal County Council
Register status
In progress
Type
Permission
Received
26 May 2026

Summary

AI-generated

This infrastructure project involves laying a 3.7 km underground medium voltage cable primarily under public roads, requiring directional drilling under the M50 and Turnapin Stream. The development also includes the construction of two single-storey 20kV substations in Balcurris and Ballystraun.

Infrastructuregridsubstationcablem50
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development which will consist of the construction of a medium voltage (mv) underground cable (ugc), c. 3.7 km in length, between the existing poppintree 110kv substation on a site to the south of st. Margaret's road (r104) in the townland of ballymun, co. Dublin and a proposed single-storey 20kv substation on a site to the south of the old airport road (l2015) in the townland of ballystraun, co. Dublin. The proposed ugc will be principally located underneath public roads (r104, m50, and naul road (r108)) in the townlands of ballymun and balcurris, co. Dublin (c. 2.3 km in length), with the remainder, c. 1.4km in length, located in the townlands of ballymun, coultry and ballystraun, co. Dublin. The proposed ugc will require horizontal directional drilling (hdd) under the m50 and under the turnapin stream. The proposed development will also consist of 2 no. Single-storey 20kv substations, including 1 no. 20kv substation (substation
  • On a site to the south of the r104 in the townland of balcurris, co. Dublin, and 1 no. 20kv substation (substation
  • On a site to the south of the old airport road (l2015) in the townland of ballystraun, co. Dublin, and all site development and landscaping works, including a construction compound, and a hdd work area. The ugc route will consist of a trench containing 4 no. 125mm diameter ducts as far as substation 1 where 2 no. 125mm diameter ducts will terminate, and the remaining 2 no. 125mm diameter ducts will continue to their termination at substation
  • The proposed development will serve the construction phase of metrolink. On 30 september 2025 an coimisiún pleanála granted a railway order for metrolink (the 'ro') pursuant to section 43 (2) of the transport (railway infrastructure) act 2001 (as amended) (the '2001 act'). On 12 january 2026, the ro became operative pursuant to section 43 (4) of the 2001 act. Following completion of the metrolink tunnelling works, the proposed ugc located underneath public roads (r104, m50, naul road (r108)) will be decommissioned and capped for safety, while the ducting will remain in place for potential future reuse by esb. That part of the proposed ugc that is located on private lands will be decommissioned by removing the supply cable. The 2 no. Proposed substations will be decommissioned and removed on completion of the metrolink tunnelling works and these lands will be reinstated. An environmental impact assessment report (eiar) and natura impact statement (nis) have been prepared in respect of the proposed development and will be submitted to the planning authority with the application

Land-use zoning

What this land is zoned for

GE - General EmploymentSI
Provide opportunities for general enterprise and employment

National zoning type: Industrial, enterprise, employment

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
19, Carton Terrace, Poppintree Dublin 11not full market priceJul 2025€132,000314 m
4 Gallaun Rd, Poppintree, Dublin 11Oct 2025€290,000434 m
45 Oile�in Na Crann�ige, Balbutcher Lane, Ballymunprice excludes VATMar 2025€247,276435 m
9, Graigue Court, Poppintree BallymunApr 2026€380,000452 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 May 2026
  2. Decision due23 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.