Planning Permission Ireland
GrantedIndustrialDecided 4 March 2025

Site 636 Northwest Logisitics Park, Kilshane Park, Northwest Business Park, Ballycoolin, Dublin 15

Construction of a new light industrial and warehouse unit with three floors of ancillary offices and 127 car parking spaces.

FW25A/0008E · Fingal County Council · Lodged 10 January 2025

Reference
FW25A/0008E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
10 January 2025

Summary

AI-generated

The project consists of building a new light industrial and warehouse facility featuring ground-floor warehouse space with a mezzanine level. It includes ancillary offices and staff facilities over three floors, a service yard with loading bays, and parking for 127 cars and 80 bicycles.

Industrialwarehouseindustriallogistics
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the construction of a new light industrial/warehouse unit with associated ancillary office space. The building will comprise: (i) light industrial/warehouse floor space inclusive of plant rooms at ground floor level, with an open plan mezzanine level above; and (ii) ancillary office space and staff facilities in the northern portion of the building over three floors. The proposed facility will be accessed via kilshane park to the north, with a staff and visitor vehicular entrance proposed to the northwest, a separate hgv & yard entrance to the northeast and a designated pedestrian entrance located adjacent to the proposed staff and visitor vehicular entrance. A gated fire tender access is provided on the western side of the proposed building. Externally the proposal will include: (iii) 127 no. Car parking spaces (including 7 no. Accessible spaces and 14 no. Ev charging spaces); (iv) 80 no. Bicycle parking spaces; and (v) 13 no. Motorbike parking spaces; (vi) internal roads, footpaths and a pedestrian crossing point; (vii) a service yard to the rear of the building including 3 no. Hgv loading bays, trailer parking and 1 no. Level access; (viii) a pump house, esb substation and water storage tank to the east of the building. Associated site and infrastructural works are also proposed which include: foul and surface water drainage including suds, plant areas, roof top solar panels, landscaping, boundary treatments, site lighting, signage; and (ix) all ancillary works necessary to facilitate the proposed development.

Land-use zoning

What this land is zoned for

GE - General EmploymentSI
Provide opportunities for general enterprise and employment

National zoning type: Industrial, enterprise, employment

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received10 January 2025
  2. Decision due6 March 2025
  3. Decision issued4 March 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.