Planning Permission Ireland
InvalidEnergyDecided 7 February 2025

Astellas Ireland Co Ltd., Damastown Industrial Park, Dublin 15, D15 K851

Installation of 10,400 square metres of ground-mounted solar panels at an industrial campus.

FW25A/0032E · Fingal County Council · Lodged 31 January 2025

Reference
FW25A/0032E
Authority
Fingal County Council
Register status
Invalid or incomplete
Type
Permission
Received
31 January 2025

Summary

AI-generated

The proposed development comprises the installation of 10,400 square metres of ground-level photovoltaic solar panels on metal frames. The project will be located to the east of the existing industrial campus and includes an electrical enclosure, fencing, and trenching at a site subject to major accident regulations.

Energysolarrenewableindustrial
Floor area
10,400 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will comprise: the installation of 10,400m2 of photovoltaic (pv) solar panels on metal frames at ground level to the east of the campus, an electrical equipment enclosure, fencing, landscaping, underground trenches, and associated site works. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. No. P0007-03). The application relates to the provision of an establishment to which the major accident regulations apply.

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received31 January 2025
  2. Decision due27 March 2025
  3. Decision issued7 February 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.