Planning Permission Ireland
InvalidHousing estateDecided 16 September 2025

Lands in the Townlands of, Kellystown and Porterstown, Dublin 15

Construction of 56 homes including 50 houses and 6 duplex/apartment units in Dublin 15.

FW25A/0393E · Fingal County Council · Lodged 12 September 2025

Reference
FW25A/0393E
Authority
Fingal County Council
Register status
Invalid or incomplete
Type
Permission
Received
12 September 2025

Summary

AI-generated

The development comprises 56 dwellings ranging from 2 to 3 storeys in height. This includes 50 houses (33 three-bed and 17 four-bed) and 6 duplex/apartment units with balconies.

Housing estatehousing estateduplexapartments
Residential units
56
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Castlethorn developments luttrellstown limited, intends to apply for permission at a site (c. 2.35ha) in the townlands of porterstown and kellystown, dublin
  • The site (luttrellstown gate phase 2 - site a) is located within the kellystown local area plan development boundary. The site is generally bounded to the north by the dublin-maynooth rail line, to the south by permitted strategic housing development (abp-312318-21 as amended by lrd0034/s3) known as luttrellstown gate (phase 1), to the east by concurrent planning application known as luttrellstown gate (phase 2 - site b) and to the west by agricultural lands. The site boundary extends to the southwest to accommodate foul drainage to a permitted foul pumping station and surface water drainage to a permitted attenuation pond (both on phase 1 lands permitted under abp-312318-21 as amended by lrd0034/s3). The proposed development comprises 56 no. Dwellings, in a mix of houses and duplex units / own-door apartments, ranging from 2-3 storeys in height, including 50 no. Houses (33 no. 3-bed and 17 no. 4-bed), and 6 no. Duplex/apartment units with balconies (4 no. 1-bed and 2 no. 2-bed); and all associated and ancillary site development, landscaping and boundary treatment works, including: 79 no. Surface car parking spaces; 71 no. Bicycle parking spaces for mid-terrace and duplex units; bin stores; private, communal and public open space; public lighting; minor amendments to the permitted surface water attenuation pond. Vehicular access is provided off the existing kellystown link road via the internal roads of luttrellstown gate (phase 1)

Land-use zoning

What this land is zoned for

RA - Residential AreaR1
Provide for new residential communities subject to the provision of the necessary social and physical infrastructure

National zoning type: New/proposed residential

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 Kennan Green, Luttrellstown Gateprice excludes VATSept 2025€497,79780 m
3 Kennan Drive, Luttrellstown Gateprice excludes VATJun 2026€502,20380 m
11 Kennan Walk, Luttrellstown Gateprice excludes VATJun 2026€502,20382 m
13 Kennan Green, Luttrellstown Gateprice excludes VATSept 2025€497,79785 m
7 Kennan Walk, Luttrellstown Gateprice excludes VATJun 2026€497,79791 m
37 Kennan Avenue, Luttrellstown Gateprice excludes VATOct 2025€590,30893 m
47 Kennan Avenue, Luttrellstown Gate, D15price excludes VATApr 2026€515,418115 m
27 Kennan Avenue, Luttrellstown Gate, Dublin 15Dec 2025€570,000119 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 September 2025
  2. Decision due6 November 2025
  3. Decision issued16 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.