Planning Permission Ireland
InvalidIndustrialDecided 16 September 2025

Server Building 2, 3 and 6, IBM Technology Campus, Damastown Industrial Park, Mulhuddart, Dublin 15

Construction of three new substations and demolition of corridor links at the IBM Technology Campus.

FW25A/0395E · Fingal County Council · Lodged 15 September 2025

Reference
FW25A/0395E
Authority
Fingal County Council
Register status
Invalid or incomplete
Type
Permission
Received
15 September 2025

Summary

AI-generated

The development consists of constructing three standalone substations totaling 118 sqm, demolishing two corridor links between server buildings, demolishing an existing substation, and carrying out utility and landscaping upgrades.

Industrialsubstationdemolitiontech campus
Floor area
118 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of the following: a) construction of three new substations, standalone with a total area of 118 sqm, at rear of the existing server buildings 2, 3, and 6 at the ibm technology campus. B) demolition of the two existing corridor links between server buildings 2 and
  • New external cladding and doors to match existing finishes. C) demolition of existing substation standalone at southeast side. D) site wide underground to utilities upgrade works. E) landscape alterations to the areas where existing corridor links were demolished, to be replaced with hard landscaping

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received15 September 2025
  2. Decision due7 November 2025
  3. Decision issued16 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.