Server Building 2, 3 and 6, IBM Technology Campus, Damastown Industrial Park, Mulhuddart, Dublin 15
Construction of three substations and demolition of corridor links at the IBM Technology Campus.
FW25A/0409E · Fingal County Council · Lodged 22 September 2025
- Reference
- FW25A/0409E
- Authority
- Fingal County Council
- Register status
- Invalid or incomplete
- Type
- Permission
- Received
- 22 September 2025
Summary
AI-generatedThe development consists of building three new standalone substations totaling 118 sqm at the rear of existing server buildings. It also includes the demolition of two corridor links and an existing substation, alongside utility upgrades and landscaping.
- Floor area
- 118 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- The development will consist of the following: a) construction of three new substations, standalone with a total area of 118 sqm, at rear of the existing server buildings 2, 3, and 6 at the ibm technology campus. B) demolition of the two existing corridor links between server buildings 2 and
- C) new external cladding and doors to match existing finishes. D) demolition of existing substation standalone at southeast side. E) site wide underground utilities upgrade works. F) landscape alterations to the areas where existing corridor links were demolished, to be replaced with hard landscaping
Land-use zoning
What this land is zoned for
“Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment”
National zoning type: Office, business/technology park and related
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received22 September 2025
- Decision due14 November 2025
- Decision issued25 September 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
IBM Ireland Product Distribution Limited intends to apply for planning
Server Building 3, IBM Technology Campus, Damastown Industrial Park, M
FW25A/0207EFingalLodged 12 May 2025Commercial
- Granted30 m away
Change of use of 555sqm of ground floor space of existing 14,564sqm ma
Server Building 3, IBM Technology Campus, Damastown Industrial Park, M
FW11A/0024FingalLodged 21 Mar 2011Change of use
- Invalid30 m away
The development will consist of the following: A) Construction of three new substations, standalone with a…
Server Building 2, 3 and 6, IBM Technology Campus, Damastown Industrial Park, Mulhuddart, Dublin 15
FW25A/0395EFingalLodged 15 Sept 2025Industrial
- Granted30 m away
Change of use of 2,224sqm of gournd floor space of exsting 14,564sqm m
Server Building 3, IBM Technology Campus, Damastown Industrial Estate,
FW12A/0036FingalLodged 27 Apr 2012Change of use
- Granted100 m away
Permission for development at Server Buildings 2, 3 and 6 at IBM Techn
IBM Ireland, IBM Technology Campus, Damastown Industrial Park, Mulhudd
FW25A/0422EFingalLodged 26 Sept 2025Commercial
- Granted100 m away
Planning permission is being sought for the change of use of 1,449m²
IBM Technology Campus, Damastown Industrial Park, Mulhuddart, Dublin 1
FW14A/0010FingalLodged 3 Feb 2014Change of use
- Granted120 m away
The change of use 2321m2 of ground floor space of existing 5,975m2 Ser
IBM Technology Campus, Building 2, Damastown Industrial Park, Mulhudda
FW18A/0098FingalLodged 9 Jul 2018Change of use
- Withdrawn130 m away
Permission
IBM Technology Campus (Server Building 4), Damastown Industrial Park,
FW13A/0116FingalLodged 10 Oct 2013
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidIndustrial
The development will consist of the following: A) Construction of three new substations, standalone with a…
Server Building 2, 3 and 6, IBM Technology Campus, Damastown Industrial Park, Mulhuddart, Dublin 15
FW25A/0395EFingalLodged 15 Sept 2025
- GrantedInfrastructure
The development will consist of a physical extension of c. 300 sq.m to the existing electricity substation…
The existing ESB Athboy 38kV Substation , townlands of Martinstown , Athboy Co. Meath
2360497MeathLodged 20 Dec 2023
- GrantedInfrastructure
The development will consist of a physical extension of c. 1200 sq.m to the existing electricity substation…
ESB 110kV Substation , Mount Avenue Dundalk County Louth (Townland - Farrandreg) , OS map no. 1631-20 1631-25 1631-D 1701-05 AND 1701-B
2560674LouthLodged 22 Oct 2025
- GrantedInfrastructure
The proposed development will consist of development within the existing substation to include: (a) removal…
ESB 38 kV Substation , Carrigshane, Midleton, Co. Cork
196190corkLodged 5 Sept 2019
- Awaiting decisionInfrastructure
Development primarily comprises the demolition of existing structures on site and the provision of a…
Avoca River Park , Arklow , Co. Wicklow
SI202102WicklowLodged 22 Jan 2021
- GrantedInfrastructure
The proposed development will consist of the construction of a 110 kV / MV electrical substation and will…
St Vincent's University Hospital, Nutley lane, Dublin 4 , D04T6F4
WEB1284/25Dublin CityLodged 14 Feb 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.