Huntstown Power Station, Townlands of Kilshane, Huntstown and Johnstown, Dublin, D11 N406
Installation of an Open Cycle Gas Turbine generating unit and associated plant at Huntstown Power Station.
FW26A/0163E · Fingal County Council · Lodged 22 April 2026
- Reference
- FW26A/0163E
- Authority
- Fingal County Council
- Register status
- In progress
- Type
- Permission
- Received
- 22 April 2026
Summary
AI-generatedThe proposed development comprises the construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit. The project includes a 35m high exhaust stack, gas turbine and generator buildings, water and fuel storage tanks, and associated infrastructure.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The proposed development will comprise the following: construction/ installation of an open cycle gas turbine (ocgt) generating unit and associated plant and equipment, comprising the following main components: an exhaust stack 35m in height and 9m internal diameter gas turbine air intake (10.9m l x 20.5m w x 32.5m h) generator building (16.5m l x 15.1m w x 13.1m h) gas turbine building (22m l x 43.2m w x 24m h) including gas turbine enclosure and auxiliaries and loading/ rotor turning area exhaust diffuser including silencer (38m l x 9m w x 9m h) gas turbine power control and electrical c&i (electrical pecc) module including transformers (18m l x 10.5m w x 6.0m h) fin fan cooler package (24.2m l x 11.2m w x 6.4m h) step up transformer (11.6m l x 23.2m w x 10.4m h) with 9.7m high blast wall auxiliary transformer (5.3m l x 4.0m w x 4.9m h) with 4.2m high blast wall demineralised water tank (20m diameter and 24.5m h) demineralised water pumphouse (10m l x 5m w x 5m h) 2no raw/ fire water tanks (14m diameter and 15.5m h) 2no distillate fuel (secondary/emergency) oil tank (26m diameter and 20.7m h) fuel oil bund (46m l x 82m w x 5.5m h) fuel oil unloading and forwarding pumphouse (46m l x 11m w x 5m h) fire fighting pumphouse (10m l x 8m w x 5m h) fire fighting foam tanks and bund (8m l x 7m w x 2m h) emergency diesel generator (6m l x 2.4m w x 2.8m h) generator circuit breaker (2.3m l x 4.3m w x 1.5m h) gas heating area including hot water heaters (25m l x 13m w x 8.0m h), continuous emissions monitoring system enclosure [cems] (2.1m l x 2.0m w x 2.4m h) workshop, and administration building (34.5m l x 13.5m w x 9.5m h) 2no. Stores buildings (15m l x 10m w x 8m h) propane skid (16.2m l x 4.9m w 3.5m h) the proposed development will also comprise site enabling, services and development works necessary to facilitate the proposed development, including temporary construction compound and laydown area, palisade perimeter fencing, fire walls, above-ground pipe racks (4.4m wide and up to 7m high to underside of steel), underground cables, lighting, lightning masts, parking, landscaping, underground drainage tanks and surface water drainage. The planning application is accompanied by an environmental impact assessment report (eiar). The eiar contains an assessment of the proposed development, the subject of the planning application to fingal county council, and the future related substation, grid connection route and gas infrastructure. The development consists of an activity for which an industrial emissions licence is required. The application site is located within lands which are categorised as lower tier comah site (huntstown power station) and therefore fall under the requirements of the control of major accident hazard (comah) regulations, 2015. The planning application and environmental impact assessment report may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the planning authority during its public opening hours.
Land-use zoning
What this land is zoned for
“Provide for heavy industry”
National zoning type: General industry
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received22 April 2026
- Decision due18 June 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted250 m away
The development will comprise an increase in the rate of imporation of
Kilshane, Huntstown & Johnstown Townlands, North Road, Finglas, Dublin
FW17A/0012FingalLodged 6 Feb 2017Infrastructure
- Granted360 m away
The replacement of approx. 251 m of existing 2.4 m high chainlink perimeter fencing and associated access /…
Huntstown Powerstation, Huntstown, Co. Dublin
FW25A/0086EFingalLodged 7 Mar 2025Infrastructure
- Invalid360 m away
Permission is sought for the replacement of approx. 251 m of existing 2.4 m high chainlink perimeter fencing…
Huntstown AGI (Above Ground Installation), Huntstown Power Station, Huntstown, Co. Dublin
FW24A/0513EFingalLodged 10 Dec 2024Infrastructure
- Invalid360 m away
Permission for works to an existing Above Ground Natural Gas Installation at Huntstown Power Station. The…
Huntstown Power Station, Huntstown, Co. Dublin
FW25A/0009EFingalLodged 14 Jan 2025Infrastructure
- Granted420 m away
Permission for an amendment to the original planning permission, at th
Newtown and Coldwinters, North Road, Co. Fingal
FW20A/0219FingalLodged 23 Dec 2020Alterations
- Granted420 m away
Permission for (i) Demolition of existing 2 no 2 storey semi detached
Ravenswood, and two semi-detached residences to the south,, at Kilshan
FW14A/0162FingalLodged 13 Apr 2015Demolition
- Granted420 m away
Amendments to previously approved application (ref FW14A/0162) which c
Kilshane, Newtown North Road (R135), Finglas, Co. Dublin.
FW18A/0038FingalLodged 21 Mar 2018Alterations
- Granted430 m away
The proposed development will consist of the installation of 10 No. co
Newtown & Coldwinters, North Road, Fingal, Co. Dublin
FW19A/0090FingalLodged 25 Oct 2019Other
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada Generating Station…
ESB Aghada Generating Station, Ballincarroonig, Aghada, Co Cork
235104corkLodged 6 Jun 2023
- GrantedEnergy
PERMISSION:The proposed development will consist of the following elements: 1.Demolition of two storage…
Adjacent to the Dublin Bay Power Generating Station, Pigeon House Road, Dublin, D04 Y5N2
PWSDZ3074/23Dublin CityLodged 20 Jan 2023
- GrantedEnergy
The proposed development will consist of — Demolition of the existing Babcock Store building; 1 No. Hydrogen…
Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82
3137/23Dublin CityLodged 31 Jan 2023
- Awaiting decisionEnergy
The development will consist of a 55 MWe (electrical output) aero derivative gas fired turbine, including the…
On lands to the east of the R630 in the townlands , of Ballincarroonig and Aghada, located inside the, Aghada Generating Station, Ballincarroonig, Whitegate, Co. Cork
194937corkLodged 16 Apr 2019
- GrantedEnergy
For an Open Cycle Gas Turbine power plant (299MW) and associated infrastructure and buildings. The proposed…
Derryfrench ,
212192galwayLodged 24 Nov 2021
- Awaiting decisionEnergy
The proposed development will comprise a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant…
Carranstown & Caulstown , Platin , Duleek Co. Meath
LB181494MeathLodged 13 Dec 2018
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.