Awaiting decisionEnergyDecision was due 18 June 2026

Huntstown Power Station, Townlands of Kilshane, Huntstown and Johnstown, Dublin, D11 N406

Installation of an Open Cycle Gas Turbine generating unit and associated plant at Huntstown Power Station.

FW26A/0163E · Fingal County Council · Lodged 22 April 2026

Reference
FW26A/0163E
Authority
Fingal County Council
Register status
In progress
Type
Permission
Received
22 April 2026

Summary

AI-generated

The proposed development comprises the construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit. The project includes a 35m high exhaust stack, gas turbine and generator buildings, water and fuel storage tanks, and associated infrastructure.

Energypower stationgas turbineinfrastructureenergy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will comprise the following: construction/ installation of an open cycle gas turbine (ocgt) generating unit and associated plant and equipment, comprising the following main components: an exhaust stack 35m in height and 9m internal diameter gas turbine air intake (10.9m l x 20.5m w x 32.5m h) generator building (16.5m l x 15.1m w x 13.1m h) gas turbine building (22m l x 43.2m w x 24m h) including gas turbine enclosure and auxiliaries and loading/ rotor turning area exhaust diffuser including silencer (38m l x 9m w x 9m h) gas turbine power control and electrical c&i (electrical pecc) module including transformers (18m l x 10.5m w x 6.0m h) fin fan cooler package (24.2m l x 11.2m w x 6.4m h) step up transformer (11.6m l x 23.2m w x 10.4m h) with 9.7m high blast wall auxiliary transformer (5.3m l x 4.0m w x 4.9m h) with 4.2m high blast wall demineralised water tank (20m diameter and 24.5m h) demineralised water pumphouse (10m l x 5m w x 5m h) 2no raw/ fire water tanks (14m diameter and 15.5m h) 2no distillate fuel (secondary/emergency) oil tank (26m diameter and 20.7m h) fuel oil bund (46m l x 82m w x 5.5m h) fuel oil unloading and forwarding pumphouse (46m l x 11m w x 5m h) fire fighting pumphouse (10m l x 8m w x 5m h) fire fighting foam tanks and bund (8m l x 7m w x 2m h) emergency diesel generator (6m l x 2.4m w x 2.8m h) generator circuit breaker (2.3m l x 4.3m w x 1.5m h) gas heating area including hot water heaters (25m l x 13m w x 8.0m h), continuous emissions monitoring system enclosure [cems] (2.1m l x 2.0m w x 2.4m h) workshop, and administration building (34.5m l x 13.5m w x 9.5m h) 2no. Stores buildings (15m l x 10m w x 8m h) propane skid (16.2m l x 4.9m w 3.5m h) the proposed development will also comprise site enabling, services and development works necessary to facilitate the proposed development, including temporary construction compound and laydown area, palisade perimeter fencing, fire walls, above-ground pipe racks (4.4m wide and up to 7m high to underside of steel), underground cables, lighting, lightning masts, parking, landscaping, underground drainage tanks and surface water drainage. The planning application is accompanied by an environmental impact assessment report (eiar). The eiar contains an assessment of the proposed development, the subject of the planning application to fingal county council, and the future related substation, grid connection route and gas infrastructure. The development consists of an activity for which an industrial emissions licence is required. The application site is located within lands which are categorised as lower tier comah site (huntstown power station) and therefore fall under the requirements of the control of major accident hazard (comah) regulations, 2015. The planning application and environmental impact assessment report may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the planning authority during its public opening hours.

Land-use zoning

What this land is zoned for

HI - Heavy IndustrySI
Provide for heavy industry

National zoning type: General industry

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received22 April 2026
  2. Decision due18 June 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.