Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82
Demolition of existing structures and construction of a new gas turbine generating unit with a 40-metre exhaust stack at Poolbeg.
3137/23 · Dublin City Council · Lodged 31 January 2023
- Reference
- 3137/23
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 31 January 2023
Summary
AI-generatedThe development at Poolbeg Generating Station involves the demolition of a store building, a hydrogen tank, a temporary control building, and a water tank. In their place, a new Open Cycle Gas Turbine (OCGT) generating unit will be installed. This will include a 40m high exhaust stack, air intake, generator enclosure, transformers, and a demineralised water treatment plant.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- The proposed development will consist of
- Demolition of the existing babcock store building; 1 no. Hydrogen tank; the temporary control building; 1 no. Water tank within the national oil reserves agency (nora) bunded area
- Construction/ installation of an ocgt generating unit and associated plant and equipment, comprising the following main components: - an exhaust stack approx. 40m in height (approx. 8m diameter and 40m h) - gas turbine air intake (approx. 24m l x 18m w x 26m h) - generator enclosure (approx. 24m l x 18m w x 14.5m h) - gas turbine enclosure including gas turbine auxiliaries and loading / rotor turning area (approx. 53m l x 15mw x 26m h) - exhaust diffuser (approx. 14.5m l x 10.4m w x 10.5m h) - gas turbine power control and electrical control & instrumentation (c&i) module (approx. 24m l x 18m w x 10m h)
- 9no. Fin fan coolers (approx. 27m l x 19m w x 8m h) - main transformer (approx. 12.2m l x 7.5m w x 9.3m h), including
- 17.5m x 18m bund; and
- 3no 12m high blast walls - auxiliary transformer (approx. 4.9m l x4.7m w x 6.9m h)
- 6.8m x 7.5m bund; and
- 2no 12m high blast walls - demineralised water treatment plant (approx. 20m l x 10m w x 5.4m h) - demineralised water tank (approx. 22.3m diameter and 14.6m h) - raw/fire water tank (approx. 15.2m diameter and 14.6m h)
- 8,000m3 distillate fuel (secondary oil tank (approx. 27.2m diameter and 17.6m h) - including 8no 1.7m high baffle walls surrounding the tank - fuel oil forwarding pump (approx. 8.9m l x 7.8m w x 2.2m h) - fire fighting pumphouse (approx. 12m l x 7m w x 5.4m h)
- 1 no. <1 mw thermal output emergency diesel generator 250kwe (approx. 10m l x 4m w x 5m h) - generator circuit breaker (approx. 8.8m l x5.1m w x 4m h)
- 2 no. Water (replacement) firewater tanks for nora (approx. 13m diameter and 14.6m h)
- 3-bay 220kv indoor switchgear building (approx. 30m l x 18m w x 18m h) and 3 no. Bolted connections (approx. 12.5m l x 15m w x 15m h) - gas conditioning compound (approx. 42.2m l x 11.4m w x 3.6m h) which includes: - gas compressor and auxiliaries building (approx. 24m l x 7.5m w x 5m h) - gas compressor reducing building (approx. 8m l x 6m w x 6m h); and - gas compressor cooler (approx. 7m l x 4m w x 5m h) - hydrogen storage compound (approx. 6m l x 3.5m w x 3m h) - continuous emissions monitoring system (cems) (approx. 3.5m l x 2.5m w x 5m h) - ccgt stores building (approx. 15m lx 14m w x 10m h) - workshop, stores and administration building (approx. 23m l x 22m w x 15m h)
- Connection to the existing gas above ground installation (agi)
- Connection to the national grid via the existing 220kv poolbeg substation; and
- All associated works to facilitate the development (e. G. Temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the esb poolbeg generating station complex. The development consists of an activity for which an industrial emissions licence is required. An environmental impact assessment report (eiar) which compiles with the european union (planning and development) (environmental impact assessment) regulations 2018 (s. I 296 of 2018 and a natura impact statement (nis) will be submitted to the planning authority with the application
Land-use zoning
What this land is zoned for
“To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.”
National zoning type: General industry
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 31 January 2025.
Notified floor area: 1,181.6 m²
2 commencement notices are linked to this development.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received31 January 2023
- Decision due2 November 2023
- Decision issued2 November 2023
- Permission expiry24 January 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted60 m away
The Electricity Supply Board (ESB) intends to apply for planning permission for development on a c. 5.6 ha…
Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82)
3624/20Dublin CityLodged 23 Oct 2020Energy
- Withdrawn100 m away
Planning permission for development on a c. 3 ha site located fully within the existing Poolbeg Generating…
Poolbeg Generating Station, Pigeon House Road, Dublin 4
3714/19Dublin CityLodged 9 Aug 2019Energy
- Granted100 m away
Planning permission for development on a c. 5.3 ha site located within the existing Poolbeg Generating…
Poolbeg Generating Station, Pigeon House Road, Dublin 4
3625/20Dublin CityLodged 23 Oct 2020Energy
- Invalid150 m away
Planning Permission for works to an existing above ground Natural Gas Installation - the construction of 1…
Poolbeg Power Station, Pigeon House Rd, Dublin 4
WEB2681/24Dublin CityLodged 10 Dec 2024Infrastructure
- Granted150 m away
Planning Permission for the construction of 1 no. 8 m CCTV pole and all associated works
Poolbeg Power Station, Pigeon House Road, Dublin 4
WEB2703/24Dublin CityLodged 12 Dec 2024Infrastructure
- Granted150 m away
Permission for works to an existing above ground natural gas installation. The development will consist of…
Poolbeg Power Station, Pigeon House Road, Dublin 4
WEB1928/25Dublin CityLodged 27 Apr 2025Infrastructure
- Invalid150 m away
Permission for works to an existing above ground natural gas installation. The works will consist of the…
Poolbeg Power Station, Pigeon House Rd, Dublin 4
WEB1532/25Dublin CityLodged 13 Mar 2025Infrastructure
- Invalid150 m away
Permission for works to an existing above ground natural gas installation. The development will consist of…
Poolbeg Power Station, Pigeon House Road, Dublin 4
WEB1605/25Dublin CityLodged 21 Mar 2025Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
PERMISSION:The proposed development will consist of the following elements: 1.Demolition of two storage…
Adjacent to the Dublin Bay Power Generating Station, Pigeon House Road, Dublin, D04 Y5N2
PWSDZ3074/23Dublin CityLodged 20 Jan 2023
- GrantedEnergy
Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada Generating Station…
ESB Aghada Generating Station, Ballincarroonig, Aghada, Co Cork
235104corkLodged 6 Jun 2023
- Awaiting decisionEnergy
The proposed development will comprise the following: Construction/ installation of an Open Cycle Gas Turbine…
Huntstown Power Station, Townlands of Kilshane, Huntstown and Johnstown, Dublin, D11 N406
FW26A/0163EFingalLodged 22 Apr 2026
- GrantedEnergy
The Electricity Supply Board (ESB) intends to apply for planning permission for development on a c. 5.6 ha…
Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82)
3624/20Dublin CityLodged 23 Oct 2020
- WithdrawnEnergy
Planning permission for development on a c. 3 ha site located fully within the existing Poolbeg Generating…
Poolbeg Generating Station, Pigeon House Road, Dublin 4
3714/19Dublin CityLodged 9 Aug 2019
- GrantedEnergy
Planning permission for development on a c. 6.1 ha site to the south of the existing Dublin Bay Power…
Dublin Bay Power Station, Pigeon House Road, Dublin 4, D04 Y5N2
3647/20Dublin CityLodged 29 Oct 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.