GrantedEnergyDecided 2 November 2023

Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82

Demolition of existing structures and construction of a new gas turbine generating unit with a 40-metre exhaust stack at Poolbeg.

3137/23 · Dublin City Council · Lodged 31 January 2023

Reference
3137/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
31 January 2023

Summary

AI-generated

The development at Poolbeg Generating Station involves the demolition of a store building, a hydrogen tank, a temporary control building, and a water tank. In their place, a new Open Cycle Gas Turbine (OCGT) generating unit will be installed. This will include a 40m high exhaust stack, air intake, generator enclosure, transformers, and a demineralised water treatment plant.

Energypower stationinfrastructuredemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development will consist of
  • Demolition of the existing babcock store building; 1 no. Hydrogen tank; the temporary control building; 1 no. Water tank within the national oil reserves agency (nora) bunded area
  • Construction/ installation of an ocgt generating unit and associated plant and equipment, comprising the following main components: - an exhaust stack approx. 40m in height (approx. 8m diameter and 40m h) - gas turbine air intake (approx. 24m l x 18m w x 26m h) - generator enclosure (approx. 24m l x 18m w x 14.5m h) - gas turbine enclosure including gas turbine auxiliaries and loading / rotor turning area (approx. 53m l x 15mw x 26m h) - exhaust diffuser (approx. 14.5m l x 10.4m w x 10.5m h) - gas turbine power control and electrical control & instrumentation (c&i) module (approx. 24m l x 18m w x 10m h)
  • 9no. Fin fan coolers (approx. 27m l x 19m w x 8m h) - main transformer (approx. 12.2m l x 7.5m w x 9.3m h), including
  • 17.5m x 18m bund; and
  • 3no 12m high blast walls - auxiliary transformer (approx. 4.9m l x4.7m w x 6.9m h)
  • 6.8m x 7.5m bund; and
  • 2no 12m high blast walls - demineralised water treatment plant (approx. 20m l x 10m w x 5.4m h) - demineralised water tank (approx. 22.3m diameter and 14.6m h) - raw/fire water tank (approx. 15.2m diameter and 14.6m h)
  • 8,000m3 distillate fuel (secondary oil tank (approx. 27.2m diameter and 17.6m h) - including 8no 1.7m high baffle walls surrounding the tank - fuel oil forwarding pump (approx. 8.9m l x 7.8m w x 2.2m h) - fire fighting pumphouse (approx. 12m l x 7m w x 5.4m h)
  • 1 no. <1 mw thermal output emergency diesel generator 250kwe (approx. 10m l x 4m w x 5m h) - generator circuit breaker (approx. 8.8m l x5.1m w x 4m h)
  • 2 no. Water (replacement) firewater tanks for nora (approx. 13m diameter and 14.6m h)
  • 3-bay 220kv indoor switchgear building (approx. 30m l x 18m w x 18m h) and 3 no. Bolted connections (approx. 12.5m l x 15m w x 15m h) - gas conditioning compound (approx. 42.2m l x 11.4m w x 3.6m h) which includes: - gas compressor and auxiliaries building (approx. 24m l x 7.5m w x 5m h) - gas compressor reducing building (approx. 8m l x 6m w x 6m h); and - gas compressor cooler (approx. 7m l x 4m w x 5m h) - hydrogen storage compound (approx. 6m l x 3.5m w x 3m h) - continuous emissions monitoring system (cems) (approx. 3.5m l x 2.5m w x 5m h) - ccgt stores building (approx. 15m lx 14m w x 10m h) - workshop, stores and administration building (approx. 23m l x 22m w x 15m h)
  • Connection to the existing gas above ground installation (agi)
  • Connection to the national grid via the existing 220kv poolbeg substation; and
  • All associated works to facilitate the development (e. G. Temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the esb poolbeg generating station complex. The development consists of an activity for which an industrial emissions licence is required. An environmental impact assessment report (eiar) which compiles with the european union (planning and development) (environmental impact assessment) regulations 2018 (s. I 296 of 2018 and a natura impact statement (nis) will be submitted to the planning authority with the application

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 31 January 2025.

Notified floor area: 1,181.6

2 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 January 2023
  2. Decision due2 November 2023
  3. Decision issued2 November 2023
  4. Permission expiry24 January 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.