Planning Permission Ireland
GrantedHousing estateDecision was due 13 February 2026

on lands (48.4ha) within, and adjoining, Belcamp Hall (Protected Structure RPS: ID 0463), west of Malahide Road (R107) and north of the River Mayne, in the townlands of Belcamp and Clonshaugh, Dublin 17

Construction of 1,350 residential units, a childcare facility, retail space, and a school site at Belcamp Hall.

LRD0068/S3E · Fingal County Council · Lodged 23 October 2025

Reference
LRD0068/S3E
Authority
Fingal County Council
Register status
In progress
Received
23 October 2025

Summary

AI-generated

This 10-year planning application proposes 1,350 residential units comprising 802 houses, 296 apartments, and 252 walk-up apartments. The development also includes a childcare facility, non-residential retail/recreational space, playing fields, and a reserved school site on lands adjoining Belcamp Hall.

Housing estatehousing estateapartmentsschoolprotected structure
Residential units
1,350

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development seeks a 10-year planning permission for the construction of 1,350 residential units, one childcare facility, c. 1,650sq. M of non-residential floor space including retail uses and health/recreational services, playing fields and associated changing rooms and a site allocated for a school. The development will consist of: i. The demolition of an existing structure (c. 183sq. M) located in the north-eastern corner of the site; ii. The decommissioning and removal of an existing private wastewater treatment system and an existing private water well; iii. The development of 1,350 units comprising: a) 802 houses with heights varying from 2-3 storeys; b) 296 apartments across 8 blocks, ranging in height from 3-5 storeys, with a one storey landscaped area above podium car parking for some apartment blocks; and c) 252 walk-up apartments ranging in height from 3-4 storey. Iv. The overall unit mix will provide
  • 55 no. 4-bedroom units
  • 398 no. 3-bedroom units
  • 685 no. 2-bedroom units; and
  • 212 no. 1-bedroom units. V. A childcare facility and associated outdoor play space; vi. An allocation of a site (1.08ha) reserved for a school in the southwestern portion of the site; vii. Playing fields and associated clubhouse/changing facilities (c. 98sq. M); viii. Public and communal open spaces; ix. Non-residential floorspace in the form of retail and health/recreation services including class 1 (unit 1 - c. 304sq. M & unit 2 - c. 627sq. M), class 8 (c. 206sq. M) and class 11 (c. 411sq. M) and all associated signage; x. The provision of a mobility hub and public plaza; xi. A new east west distributor road is proposed to facilitate access to the site from malahide road, bus stops, on street parking, footpaths and bicycle lanes; xii. The delivery of part of a new north south link road to facilitate future connections to the r139, on street parking, footpaths and bicycle lanes; xiii. A bridge across the mayne river to accommodate the north south link road; xiv. The undergrounding of existing esb overhead lines traversing the site; xv. The provision of part of the greenway along the northern boundary of the mayne river located within the site; xvi. Works to, and beneath, the walled garden to facilitate services connections and stability works; and xvii. All landscaping and planting, infrastructure delivery and connections, car parking (on-street, podium and in-curtilage), bicycle parking, services, site lighting, bin stores, plant and all associated ancillary development works. The lands are internally bounded by belcamp hall (protected structure) and associated curtilage, and works are proposed to, and beneath, the walled garden to facilitate services connections and stability works. An environmental impact assessment report (eiar) and a natura impact statement (nis) have been prepared in respect of the proposed development

Land-use zoning

What this land is zoned for

OS - Open SpaceOS
Preserve and provide for open space and recreational amenities

National zoning type: Active open space

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received23 October 2025
  2. Decision due13 February 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.