Lands south of Main Street (Incl Smyth's Bridge House), Corballis East, Donabate, Co. Dublin
Amendments to a permitted development in Donabate, including a new commercial building and omitting residential units.
LRD0070/S3E · Fingal County Council · Lodged 10 November 2025
- Reference
- LRD0070/S3E
- Authority
- Fingal County Council
- Register status
- Decided
- Received
- 10 November 2025
Summary
AI-generatedCairn Homes Properties Limited is seeking permission for amendments to a permitted Phase 1 development near Smyth's Bridge House, a protected structure. The changes include omitting a previously permitted block of duplexes and commercial units to replace it with a part single, part two-storey commercial building containing four retail units and a community space.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Cairn homes properties limited intends to apply for permission for a large scale residential development (lrd), consisting of amendments the permitted phase 1 development (fcc reg. Ref. F20a/0204 (abp-308446-20) as amended by fcc reg. Ref. Lrd0017/s3 (subject to a concurrent amendment application under lrd0064/s3e)), at this site comprising lands south of main steet and including smyth’s bridge house (a protected structure), corballis east, donabate, county dublin. The proposed development seeks to amend permitted phase 1 development (fcc reg. Ref. F20a/0204 (abp-308446-20) as amended by fcc reg. Ref. Lrd0017/s3), on a site of 0.708 ha. The development will consist of
- Modifications to the northern portion of the permitted phase 1 development to
- Omit previously permitted commercial car parking (44 no. Spaces in total)
- Omit permitted block 1 (comprising 2 no. Commercial units (216 sqm) and 4 no. 2-bed duplex units) and associated car parking, and replace with a new part single, part two storey commercial building comprising 4 no. Retail units at ground floor (approx. 329 sqm) and 1 no. Community use space at first floor level (approx. 158 sqm); and 2 no. 4-bed, three storey, under-parked semi-detached houses (186.6 sqm gfa each) to the south of the commercial building
- Provide a new village garden and reconfigured civic space incorporating a new playground, a natural play area, bicycle parking, bin storage, and all associated landscaping works
- Incorporate a new loading bay and pedestrian footpath at main street, adjacent to smyth’s bridge house (a protected structure), and associated reconfiguration of the public road to include a new raised table toucan crossing; and
- Amend the surface treatment on main street carriageway to provide high quality natural stone paving at the raised table. The proposed amendments result in an overall decrease in residential units in the permitted phase 1 development from 54 no. As permitted to 52 no. Proposed, and an increase in total new commercial floor area from 216 sqm to 329 sqm gfa (excluding additional commercial floor area associated with smyth’s bridge house and the former coach house & barn as detailed below) and a new community space of 158 sqm gfa
- Incorporation of smyth’s bridge house (a protected structure), its associated outbuildings and the former coach house and barn into the phase 1 public realm and the associated conservation and refurbishment of the existing buildings including the following works
- Conservation works at smyth’s bridge house (a protected structure) for continued public house and restaurant use (411 sqm gfa) including removal of the existing render and replacement with lime render to the north, east, and west facades; replacing an existing door with a window to the north elevation, localised repairs to roof; removal of security railings to openings; provision of cast iron rainwater pipes; upgrading of mechanical and electrical services; and associated external and internal works including removal of non-original bandstand to rear
- The conservation and adaptation of 2 no. Outbuildings to smyth’s bridge house, for use ancillary to public house use, and commercial use (42 sqm and 66 sqm gfa, respectively), including repair to roof timbers, salvage and reuse of existing natural slates; repair and repointing of external stone walls; fitting of replacement sash windows and timber doors; insulating internal walls and floor; forming new openings x 2 and modifying an existing opening addressing public realm to east; removal of non-original walls and erection of new walls and all associated external and internal works
- The conservation and adaptation of the coach house & barn, for restaurant/café use (217 sqm gfa), including removal and reuse of existing slates; construction of new timber roof structure; repair and repointing of external stone walls; provision of cast iron rainwater pipes; insulating internal walls and floor; reinstatement of the mezzanine level, installation of new sash windows and doors; forming new openings in north, east and west elevation; provision of cast iron rainwater pipes; creation of outdoor seating area to west of building; and all associated external and internal works
- Modifications to access to the permitted phase 1 to facilitate vehicular access to residential car parking associated with the 14 no. Permitted houses and 2 no. Proposed houses, via the permitted large scale residential development (lrd) scheme (lrd0017/s3) together with all associated amendments necessary to tie-into the lrd street network. Vehicle access to phase 1 residential car parking will not be possible via main street. Pedestrian and cycle connectivity will be maintained through phase 1 from main street to the lrd scheme (lrd0017/s3) via the permitted shared cycle street. It is noted that lrd0017/s3 is subject to a separate, concurrent, amendment application under lrd0064/s3e which does not impact on the proposed development
- Modifications to the permitted street layout to incorporate a two-way shared active travel route from main street through the civic space and village garden leading to the permitted cycle street. The modifications also include provision of a new fully segregated two-way cycle track and footpath to the south, providing connectivity to the permitted two-way cycle tracks and footpaths within the permitted lrd development which form a direct link with the pedestrian and cycle facilities at the donabate distributor road
- All associated site and development works necessary to implement the proposed amendments and proposed conservation and restoration of the existing buildings
Land-use zoning
What this land is zoned for
“Provide for new residential communities subject to the provision of the necessary social and physical infrastructure”
National zoning type: New/proposed residential
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 36 The Court, Hampden Hill, Donabateprice excludes VAT | May 2026 | €418,502 | 60 m |
| 14 Station Court, Donabate, Dublin | Oct 2025 | €292,000 | 107 m |
| 13 Station Court, Donabate, Dublinnot full market price | Jan 2025 | €285,000 | 107 m |
| 8 Station Court, Donabate, Co Dublin | Jun 2026 | €271,000 | 115 m |
| 9 Station Court, Donabate, Dublin | May 2025 | €305,000 | 115 m |
| 12 The Grove, Carberry Meadows, Balmoston Donabateprice excludes VAT | Jul 2025 | €374,449 | 129 m |
| Apt 10 Ash House, Semple Woods Donabate, County Dublinprice excludes VAT | Nov 2025 | €400,881 | 129 m |
| Apt 11 Ash House, Semple Woods Donabate, County Dublinprice excludes VAT | Nov 2025 | €400,881 | 129 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received10 November 2025
- Decision due14 January 2026
- Decision issued14 January 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted40 m away
Development will consist of 55 no residential units, 3 no. retail unit
Lands to the South of Main Street, Corballis East, Donabate, Co Dubli
F20A/0204FingalLodged 25 Aug 2020Housing estate
- Granted60 m away
The construction of a single storey building in rear garden for use
29 The Strand, Donabate, Co. Dublin.
F21B/0255FingalLodged 1 Jul 2021Extension
- Granted70 m away
The provision of a new dormer style roof window on the rear roof slope
51A The Strand, Donabate, Co Dublin
F20B/0175FingalLodged 24 Jul 2020Alterations
- Granted70 m away
Construction of a new 2-storey 3 bedroom end of terrace house to the s
51 The Strand, Donabate, Co. Dublin.
F14A/0251FingalLodged 17 Feb 2015New dwelling
- Granted90 m away
A new single storey, two-bedroom detached dwelling with new vehicular
site at Prospect Hill, Donabate, Co. Dublin
F19A/0406FingalLodged 28 Feb 2020New dwelling
- Granted120 m away
Construction of 5 no 1 and 1/2 storey 4 bedroom detached houses
Prospect House, Hearse Road, Donabate, Co. Dublin
F16A/0179FingalLodged 26 Apr 2016Housing estate
- Granted130 m away
The development will consist of the construction of a dormer extension to the rear of the existing dwelling…
Carraig Cnoc, Donabate, Co. Dublin, K36 X155
F26A/0368EFingalLodged 10 May 2026Extension
- Invalid130 m away
The development will consist of the construction of a dormer extension to the rear of the existing dwelling…
Carraig Cnoc, Donabate, Co. Dublin, K36 X155
F26A/0352EFingalLodged 4 May 2026Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedHousing estate
Cairn Homes Properties Limited intends to apply for permission for a Large Scale Residential Development…
Corballis East, Donabate, County Dublin
LRD0064/S3EFingalLodged 13 Aug 2025
- GrantedHousing estate
Construction of 1,020 no. new residential dwellings on the Main Residential Development Site comprising — 70…
Corballis East, Donabate, Co Dublin
LRD0017/S3FingalLodged 21 Dec 2023
- GrantedHousing estate
A 7 No. year permission for development at this 3.50 Ha landholding in Corballis East, Dona bate, Co. Dublin,…
Corballis East, Donabate, Co Dublin
F22A/0527FingalLodged 29 May 2023
- Awaiting decisionHousing estate
We, Glenveagh Living Limited, intend to apply for permission for a Large-Scale Residential Development (LRD)…
Ballymastone, Donabate, Co Dublin
LRD0053/S3FingalLodged 23 Oct 2025
- GrantedHousing estate
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of…
Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22.
SDZ24A/0029WSouth DublinLodged 9 Jun 2025
- GrantedApartments
Permission for a Large Scale Residential Development LRD at No. 2 Firhouse Road and the former Morton's The…
No. 2 Firhouse Road and the former Morton’s The Firhouse Inn, Firhouse Road, Dublin 24, The site is also bound by Mount Carmel Park to the east
LRD26A/0001WSouth DublinLodged 22 Oct 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.