No. 80 Prospect Hill (known as Shannon Dry Cleaners) No. 82 Bohermore No. 84 Bohermore No. 86 Bohermore, and including part of the former railway tunnel (to Clifden), Galway
Demolition of existing buildings and construction of a 139-bedroom hotel up to four storeys high.
1741 · Galway City Council · Lodged 14 February 2017
- Reference
- 1741
- Authority
- Galway City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 14 February 2017
Summary
AI-generatedThe development involves the demolition of a commercial building, a dwelling, and a rear extension of a protected structure. In their place, a part-two to part-four storey hotel comprising 139 bedrooms and related facilities will be constructed.
- Storeys
- 4
- Floor area
- 5,310 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development for the construction of a hotel, on an overall site of 0.29 ha (0.73 acres). The development will consist of the: demolition of the existing single-storey commercial building at no. 80 prospect hill; demolition of the existing two-storey dwelling at no. 84 bohermore; demolition of the existing part-single, part two-storey rear extension to no. 86 bohermore (a protected structure, ref. No. 1201) and associated garden shed; construction of a part-two, part-three, part-four storey hotel over lower ground (with fourth floor level setbacks to the south-east) in 2 no. Blocks (the north-western block fronting prospect hill/bohermore) and the south-eastern block (located to the rear of the site) connected at all floor levels comprising 139 no. Bedrooms and related hotel facilities (including: reception area; lounge area; dining area; 2 no. Bars; storage; associated signage; administration and staff facilities; plant (including substation with associated switch room); waste storage area; and delivery and dispatch area), with a total gross floor area of 5,310 sq m (including lower ground level of 1,269 sq m). The development includes works to protect and conserve the older elements of no. 86 bohermore and also the existing former railway tunnel (located beneath no. 80 prospect hill) that will be integrated into the overall proposal, which includes for a change of use of these areas from residential use and infrastructural use to hotel use, respectively. The development will also include the provision of: vehicular and pedestrian access via prospect hill; 11 no. Car parking spaces; associated lighting; associated site servicing (foul and surface water drainage and water supply); suds measures, including attenuation tank and sedum roofs; and gardens and courtyards. The scheme also includes: all hard and soft landscaping; boundary treatments; changes in level; and all other associated site excavation and site development works above and below ground
Land-use zoning
What this land is zoned for
“To provide for light industry and commercial uses other than those reserved in the CC zone”
National zoning type: Industrial, enterprise, employment
Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apt 1, 74 Prospect Hill, Galway | Apr 2025 | €275,000 | 34 m |
| 12 Forster Court, Forster St, Galway | Jun 2026 | €338,500 | 47 m |
| 10 Forster Court, Galway, Galway | Jul 2025 | €567,000 | 47 m |
| 35 St Bridgets Tce, Prospect Hill, Galway City | Oct 2025 | €410,000 | 53 m |
| 71 Bohermore, Galway | Dec 2025 | €750,000 | 59 m |
| 30 St Bridgets Terrace, Prospect Hill, Galway | May 2025 | €286,000 | 76 m |
| 16 Drom Ard, Prospect Hill, Galway | Jan 2026 | €392,500 | 80 m |
| 4 Drom Ard, Prospect Hill, Galway | Jun 2025 | €286,000 | 98 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received14 February 2017
- Further information requested6 April 2017
- Further information received4 July 2017
- Decision due20 August 2017
- Decision issued18 August 2017
- Grant issued19 September 2017
- Permission expiry18 September 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Permission for development which consists of: retention permission is sought by Golden Birches Limited, at…
The Dean Hotel , No. 80 Prospect Hill and No's 82 84 & 86 Bohermore , Galway City
2560113Galway CityLodged 18 Apr 2025Retention
- GrantedAt this site
Permission for retention which will consist of revisions to the development permitted under Pl. Ref. No.…
The Dean Hotel , No. 80 Prospect Hill & No. 82 84 & 86 Bohermore , Galway City
2219Galway CityLodged 10 Feb 2022Retention
- GrantedAt this site
Permission for development which will consist of retention of revisions to the development permitted under…
Dean Hotel , No. 80 Prospect Hill and 82 84 & 86 Bohermore , Galway
22248Galway CityLodged 16 Sept 2022Retention
- Granted40 m away
Permission for development which will consist of the Retention of Roof construction over back door adjoining…
Crowes Bar , 90 Bohermore , Galway
22267Galway CityLodged 11 Oct 2022Retention
- Granted50 m away
Permission for development which consists of retention permission for minor elevation alterations including…
28 Forster Court , Galway
23235Galway CityLodged 3 Nov 2023Retention
- Granted80 m away
Permission for retention of alterations and variations of works to the rear of an existing dwelling and for…
11 St. Bridgets Terrace , Galway
18303Galway CityLodged 19 Sept 2018Retention
- Refused80 m away
EOD on Pl. Ref. 16/209: Permission to extend and renovate the existing single storey terraced house with…
104 Bohermore Road , Galway City
21276Galway CityLodged 25 Aug 2021Extension
- Granted80 m away
Permission to extend and renovate the existing single storey terraced house with front attic space and rear…
104 Bohermore Road , Galway City
16209Galway CityLodged 21 Jul 2016Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedCommercial
(A) Internal modifications to the existing layout hotel building comprising: (i) at basement level, removal…
The Ripley Court Hotel, 37 Talbot Street, Dublin 1
WEB2457/24Dublin CityLodged 8 Nov 2024
- WithdrawnCommercial
The proposed development will consist of: A) The demolition of the existing building on site (c. 973.4 sqm)…
49-51, Pleasants Street, Pleasants House & 5 Pleasants Lane, Dublin 8
WEB2794/24Dublin CityLodged 20 Dec 2024
- GrantedChange of use
Permission for development on a site of c0.26 ha. The development will consist of: (i) the change of use of…
Travelodge Galway City Hotel , Tuam Road , Joyce Roundabout
17128Galway CityLodged 12 May 2017
- GrantedCommercial
For development of a 123No.bed Hotel with Public Bar and Restaurant at a 0.26 ha site. The site is bounded by…
Corner of Wolfe Tone Street , and John's Green , Kilkenny R95 W309
2132KilkennyLodged 26 Jan 2021
- GrantedCommercial
The proposed development will consist of a hotel development consisting of the: demolition of the existing 1…
5, Arkle Road,, Sandyford Business Park, Sandyford, Dublin 18, D18 DK29
D24A/0785/WEBDún Laoghaire–RathdownLodged 31 Mar 2025
- GrantedCommercial
The development involves the demolition of the existing single storey bar at ground and basement level and to…
The Brewery Bar, 5-9 Newport Street, Dublin 8
2571/20Dublin CityLodged 25 Mar 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.