Dyke Road, Terryland, Galway
Construction of new raw water intake works, a slipway, and transfer mains near the River Corrib.
19107 · Galway City Council · Lodged 11 April 2019
- Reference
- 19107
- Authority
- Galway City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 11 April 2019
Summary
AI-generatedThis major infrastructure project includes a new raw water intake works on the River Corrib, a control building, a new public slipway with an access road, and underground transfer mains to supply the Terryland Water Treatment Plant.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development which comprises of a new raw water intake works located on the east bank of the river corrib, 100m downstream of quincentenary bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works , which in turn supplies terryland water treatment plant (wtp); and a new treated water rising main extending between terryland wtp and existing rising main on the east bank of the river corrib. The works comprises: new intake works. A) underground inlet works chamber and associated equipment; b) control building; c) compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) access road from dyke road with new entrance and gates; e) floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. F) a new slipway, including a new public access road from dyke road. The slipway will be located on the east bank of the river corrib, circa. 140m downstream of the quincentenary bridge. Transfer mains. G) 215m of 1200mm diameter underground transfer gravity main passing under terryland parkland, the quincentenary bridge eastern approach road (n6) and terryland river. This will connect the new intake works to the existing raw water mains, which supply terryland wtp. Works will include 2 no. Chambers along the transfer main ( north and south of the n6 road) and 1 no. Chamber for connection to the existing raw water mains at the existing intake site; h) modifications to the existing intake works in terryland (decommissioning and civil works). Rising main. I) 535m of 600mm diameter ductile iron underground rising main from terryland wtp of the eastern bank to the river corrib, including a pipe - bridge over the terryland river, to connect to the existing 450mm diameter ductile iron rising main upstream of the river corrib crossing. Surge vessel. J) 1 no. 35m3 surge vessel tank at terryland wtp for the proposed rising main. A natura impact statement has been submitted.
Land-use zoning
What this land is zoned for
“To provide for recreational and amenity uses”
National zoning type: Open space, park
Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 190 Dun Na Coiribe, Headford Rd, Galway | May 2025 | €550,000 | 215 m |
| 189 Dun Na Coiribe, Headford Rd, Galway | Jun 2025 | €610,000 | 220 m |
| 151 Dun Na Coiribe, Headford Rd, Galway | Jul 2025 | €700,000 | 228 m |
| 127 Dun Na Coiribe, Headford Rd, Galway | May 2026 | €368,000 | 275 m |
| 118 Dun Na Coiribe, Headford Road, Galway | Aug 2025 | €330,000 | 277 m |
| 142 Dun Na Coiribe, Headford Rd, Galway | Jun 2026 | €514,000 | 286 m |
| 83 Dun Na Coiribe, Headford Rd, Galway | Oct 2025 | €415,000 | 346 m |
| 1 Cuirt Na Coiribe, Headford Rd, Galway | Dec 2025 | €50,391,276 | 421 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received11 April 2019
- Further information requested4 June 2019
- Further information received19 December 2019
- Decision due24 January 2020
- Decision issued24 January 2020
- Grant issued24 February 2020
- Permission expiry23 February 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted50 m away
Permission for development which consists of the change of use from student accommodation to short term let…
Units 219 220 221 222 , Dun Na Coiribe , Galway
2360187Galway CityLodged 22 Dec 2023Change of use
- Granted80 m away
Permission for development which consists of: permission is being sought by Noel & Margaret Buggy from Galway…
214 Dun na Coiribe , Headford Road , Galway.
2560303Galway CityLodged 26 Sept 2025Change of use
- Granted100 m away
Permission for development which consists of a change of use from student accommodation to short term let for…
172 Dun na Coiribe , Headford Road , Galway
22342Galway CityLodged 21 Dec 2022Change of use
- Granted110 m away
Permission for development which consists of a change of use from dwelling to short term let for a period not…
168 Dun na Coiribe , Headford Road , Galway
2397Galway CityLodged 19 Apr 2023Change of use
- Granted130 m away
Permission for development which consists of a change of use from dwelling to short term let for a period not…
166 Dun na Coiribe , Headford Road , Galway
2396Galway CityLodged 19 Apr 2023Change of use
- Granted130 m away
Permission for development which consist of a change of use from student accommodation to short term let for…
176 Dun na Coiribe , Headford Road , Galway
2460321Galway CityLodged 10 Oct 2024Change of use
- Granted220 m away
Permission for development which consists of a change of use from dwelling to short term let for a period not…
189 Dun na Coiribe , Headford Road , Galway
2398Galway CityLodged 19 Apr 2023Change of use
- Granted280 m away
Permission for development which will consist of ground-mounted photovoltaic solar panels with a maximum…
Terryland Water Treatment Plant , Dyke Road , Terryland
2460324Galway CityLodged 11 Oct 2024Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionInfrastructure
Raw Water Intake & Pumping Station site (RWI&PS) which will consist of: a Bankside Intake Chamber, Raw Water…
Montpelier and Fairyhall , Limerick.
25323980LimerickLodged 19 Dec 2025
- Awaiting decisionCommercial
Permission for development which will consist of — The construction of a new watersports facility comprising…
NUIG Upper Newcastle Campus , Newcastle , Galway
22125Galway CityLodged 13 May 2022
- GrantedCommercial
Permission for development which will consist of — The construction of a new water sport facility comprising…
NUIG Upper Newcastle Campus , Newcastle , Galway
22180Galway CityLodged 30 Jun 2022
- GrantedInfrastructure
Permission for development consisting of upgrade to the existing Water Treatment Plant comprising of…
Rathvilly Water Treatment Plant , Patrickswell , Rathvilly
2169CarlowLodged 3 Mar 2021
- GrantedInfrastructure
For development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan,…
Boheraroan , Newmarket on Fergus , Co. Clare
221095ClareLodged 5 Dec 2022
- GrantedInfrastructure
The upgrade of the existing wastewater treatment plant, comprising of the replacement of the existing inlet…
Fethard Wastewater Treatment Plant , Moneypark , Fethard Co. Tipperary
2360207TipperaryLodged 28 Mar 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.