Planning Permission Ireland
GrantedAlterationsDecided 22 October 2020

4 & 5 Dock road, Galway

Amalgamation of two terraced buildings into a single house with rear extensions on Dock Road.

19356 · Galway City Council · Lodged 19 December 2019

Reference
19356
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
19 December 2019
Residential units
1
Floor area
100 m²

Summary

AI-generated

The project will merge 4 and 5 Dock Road into a single terraced dwelling, including a change of use of the ground floor of No. 4 from office to residential. It features a three-storey rear extension with a roof terrace at No. 4, a four-storey rear extension at No. 5, and window replacements.

Alterationsamalgamationextensionchange of use
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the development which will consist of (1) amalgamation of the pair of terraced buildings to form a single terraced dwelling house (2) change of use of ground floor of no 4 dock road from office use to form part of the proposed single dwelling house (3) construction of 3 storey dwelling house extension to rear of no. 4 dock road with roof terrace garden and construction of 4 storey dwellinghouse extension to the rear of no. 5 dock road. (4) replacement of existing timber windows in poor condition, with timber sliding sash windows at no 4 & 5 dock road. (5) internal alterations, together with all associated site works and services

Land-use zoning

What this land is zoned for

City CentreUC
To Provide for city centre uses

National zoning type: City/Town/village Centre, central area

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
4 Dock Street, GalwayMay 2025€315,00023 m
35d Merchants Dock, Merchants Rd, Galwaynot full market priceNov 2025€190,00047 m
35l Merchants Apt, Merchants Rd, GalwayMar 2025€299,00047 m
35a Merchants Dock, Merchants Rd, GalwayJan 2025€300,00047 m
12 Tonn Na Mara, Dock Rd, GalwayMar 2026€430,00051 m
7 Tonn Na Mara, Dock Rd, New DocksDec 2025€455,00051 m
5 Glor Na Mara, Dock Road, GalwayFeb 2025€231,00055 m
3 Glor Na Mara, Dock St, GalwayDec 2025€328,50055 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 December 2019
  2. Further information requested19 February 2020
  3. Further information received9 September 2020
  4. Decision due22 October 2020
  5. Decision issued22 October 2020
  6. Grant issued2 December 2020
  7. Permission expiry1 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.