Planning Permission Ireland
GrantedInfrastructureDecided 9 June 2020

Galway Harbour Enterprise Park, New Docks, Galway

Installation of two telecommunication cabins, emergency generators, and a welfare facility.

2050 · Galway City Council · Lodged 28 February 2020

Reference
2050
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
28 February 2020

Summary

AI-generated

Planning permission is sought for a development consisting of two telecommunication cabins and two acoustically insulated emergency generator enclosures. It also includes a welfare facility containing a toilet, kitchen, and office, alongside security fencing and ancillary works.

Infrastructuretelecomsinfrastructuregenerators

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for the development which will consist of (a) two telecommunication cabins measuring 10 metres in length, 6 metres in width and 3.076 metres in height. (b) two emergency generator enclosures acoustically insulated for use only during times of national grid interruption each containing two diesel generators and a double skinned diesel tank. (c) a 12 metre in length, 3 metres in width and 3 metres in height welfare facility containing a toilet, kitchen and office facility for periodic visiting site personnel only at times of maintenance etc. (d) security fencing around the curtilage of the proposed compound. (e) associated cabling, landscaping, boundary and ancillary works.

Land-use zoning

What this land is zoned for

Enterprise Industry and Related UsesSI
To provide for Enterprise, Industral and Related uses

National zoning type: General industry

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Ce Na Mara, New Docks, GalwayJan 2025€155,000435 m
68 Ce Na Mara, Bothar Na Long, New DocksApr 2025€350,000435 m
29 Ce Na Mara, Bother Na Long, The Docksnot full market priceMar 2026€235,000435 m
36 The Elms, Foster St, GalwayApr 2026€410,000477 m
16 The Elms, Forster St, GalwaySept 2025€415,000479 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 February 2020
  2. Decision due18 June 2020
  3. Decision issued9 June 2020
  4. Grant issued10 July 2020
  5. Permission expiry9 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.