Planning Permission Ireland
GrantedRetentionDecided 24 October 2025

Galway Harbour Enterprise Park, New Docks, Galway

Retention of alterations to the Galway Cable Landing Station, including cabin relocation.

2560272 · Galway City Council · Lodged 1 September 2025

Reference
2560272
Authority
Galway City Council
Register status
Decided
Type
RETENTION
Received
1 September 2025

Summary

AI-generated

Retention permission is sought for alterations to a previously permitted development at Galway Harbour Enterprise Park. The changes include the relocation of the westernmost 60 sq m cable landing station cabin and its emergency generator, alongside landscaping and boundary adjustments, while omitting the easternmost cabin and generator.

Retentioninfrastructuretelecomsharbour
Floor area
60 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which consists of: galway cable landing station ltd. Intends to apply for retention permission for development at a site of c. 0.14 ha at galway harbour enterprise park, new docks, galway for which permission for development, comprising two cable landing station cabins, two emergency generators, a welfare facility, and associated works, was issued on 9 july 2020 (gcc reg. Ref. 2050) and amended on 23 march 2021 (gcc reg. Ref. 20331). This application comprises retention of alterations to the permitted development including the relocation of the westernmost cable landing station cabin and its associated emergency generator, and alterations to the site landscaping, boundary treatments, and all associated works. The cable landing station cabin located on the site is 60 sq m and 3.9 m in height as per permission gcc reg. Ref. 2050. The easternmost cable landing station cabin, associated emergency generator, welfare facility, access road, and parking spaces have been omitted from the development

Land-use zoning

What this land is zoned for

Enterprise Industry and Related UsesSI
To provide for Enterprise, Industral and Related uses

National zoning type: General industry

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Ce Na Mara, New Docks, GalwayJan 2025€155,000434 m
68 Ce Na Mara, Bothar Na Long, New DocksApr 2025€350,000434 m
29 Ce Na Mara, Bother Na Long, The Docksnot full market priceMar 2026€235,000434 m
36 The Elms, Foster St, GalwayApr 2026€410,000477 m
16 The Elms, Forster St, GalwaySept 2025€415,000479 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 September 2025
  2. Decision due26 October 2025
  3. Decision issued24 October 2025
  4. Grant issued8 December 2025
  5. Permission expiry7 December 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.