GrantedInfrastructureDecided 23 February 2017

SHRONEBEIRNEDOONEEN, GLANLAREHAN AND, KNOCKNABOUL

Upgrades to a 60.4km section of the Clashavoon to Tarbert 220kV overhead power line.

161284 · Kerry County Council · Lodged 22 December 2016

Reference
161284
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
22 December 2016

Summary

AI-generated

The project involves the renewal and alteration of 110 mast structures, including foundation upgrades, along a 39.2km section of the existing 220kV overhead line in County Kerry.

Infrastructuregridelectricityinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For the development associated with the uprate of a section of the existing clashavoon to tarbert 220kv overhead line. The proposed development pertains to the length of existing overhead line between mast structure no. 63 (south-east of the existing knockanure 220kv substation,co kerry) & mast structure no. 233 (north of the existing ballyvouskill 220kv substation,co cork). The overall length of this section of overhead line is approx. 60.4km,of which 39.2km is located in co kerry & 21.2km is located in co cork). The proposed development in co. Kerry,between mast structure no. 63 & the kerry-cork co. Boundary south-east of mast structure no. 172,is located in the townlands of lacka east,foildarrig,coolvackagh,kilcarra more,scrahan,knockaderreen,rylane,meennahoma,meenscovane,ahane,beheenagh,knocknagashel east,meenbannivane,ballyduff,lackbrooder,meenleitrim north,meenleitrim south,knockachur,lackanoneen,knockardtry,kilbannivane,kilcusnaun,ballyplimoth,ballynahallia,cordal west,breahig,mullen,leaha,derreen,knockyeala,tooreengarriv & ballynahulla. The proposed development in co kerry comprises of renewal & alteration to a total of 110 mast structures,including foundation upgrade development,removal of an existing lattice steel intermediate mast structure no. 107 in the townland of lackbrooder & replacement with a new lattice steel angle mast structure up to 22m in elevation above the ground,installation of one new lattice steel angle mast structure up to 22m in elevation above the ground in the townland of meenleitrim north, & restringing of the existing overhead line with new conductor. The proposed development also includes all associated & ancillary works,including comprising or relating to permanent & temporary construction & excavation,involving construction of temporary guard poles,the construction & reinstatement of temporary access tracks,improvement & reinstatement of new temporary entrances,widening of existing entrances,temporary silt fencing,temporary silt traps,temporary culverts,temporary clear span bridging, & the clearance of vegetation at various locations along the route to facilitate the proposed principal development. (see copy of newspaper advertised). ( a natura impact statement (n. I. S. ) accompanies this application)

Key dates

Timeline

  1. Application received22 December 2016
  2. Decision due24 February 2017
  3. Decision issued23 February 2017
  4. Appeal submitted20 March 2017
  5. Appeal decided28 November 2017
  6. Permission expiry27 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.