Planning Permission Ireland
GrantedCommercialDecided 28 May 2024

Páirc An Aghasaigh Farran, Bóthair An Phoist Daingean Uí Chúis, Contae Chiarrai.

Demolition of a single-storey clubhouse to build a new clubhouse with dressing rooms, community rooms, and training area upgrades.

2460029 · Kerry County Council · Lodged 22 January 2024

Reference
2460029
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
22 January 2024

Summary

AI-generated

This proposal in Dingle involves the demolition of an existing 213 sqm clubhouse to construct a new 700 sqm single-storey clubhouse. The new facility will include dressing rooms, community rooms, offices, altered boundary walls, and realigned training facilities with floodlighting and a 3G training area.

Commercialsports clubcommunitydemolitionfloodlights
Storey
1
Floor area
700 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Proposals include the demolition of the existing single storey flat roofed club house (213 sm) & the construction of a new club house to replace same which will include to the eastern side of the entrance 4 no. Dressing rooms, referee, physio, storage & plant rooms and to the western side of the entrance facilities including 2 no. Community rooms, meeting room, office & toilet facilities. This structure will be single storey with an 'a' type roof, the overall floor area is 700 sq. Meters with a ridge height of 6.9 meters, this building will be located along the same orientation of the existing dressing rooms. The existing boundary wall & gated entrance to bóthair an phoise & bóthar na bpiarsach ( dingle relief road ) is to be altered including the lowering of same with a view to opening up páirc an ághasaigh and the associated facilities. The goals & ball netting adjacent to the location of the club house will be revised to allow for proposed works. The existing training facilities to the n/w of the site will be realigned to provide better usage of this space and are to include flood lighting. A 3g area will also be created in this area, to facilitate winter training, which will be enclosed with metal fencing and flood light. To the rear of same there will be a drills area and ball wall. Spectator facilities will be improved through the creation of a standing terrace area to the eastern side of the main pitch. A single-storey structure is proposed adjacent to the training area which will include additional machinery storage facilities as well as accessible toilet facilities and kit storage (140sm) in this location. All services including mains water & public sewer connections are available at present and will serve the proposed new club house and toilet facilities adjacent to training area. Vehicular access to páirc an ághasaigh for maintenance purposed will be via a row through secret heart university (shu) grounds to the n/w of the site adjacent to drills area. The existing stone carving celebrating tomás ághas will be incorporated into new entrance lobby. Signage identifying the facility will be as presented in drawings submitted and all other signage notices will be in irish. The proposed flood lighting to both training pitch & 3 g area has been designed by lighting specialist to provide the required lighting standards for training and playing football whilst ensuring the minimal overspill to adjoining properties from an energy efficient system.

Land-use zoning

What this land is zoned for

Active Open SpaceOS
Active Open Space is intended solely for the provision of recreational uses

Objective set by the Corca Dhuibhne Electoral Area Local Area Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
13 Marian Park, Dingle, KerrySept 2025€160,00098 m
20 Marian Park, Dingle, KerryNov 2025€395,000142 m
John St, Dingle, KerryOct 2025€500,000223 m
52 John St, Dingle, Co KerryApr 2026€350,000225 m
3 Station Rd, Dingle, KerryJul 2026€305,000232 m
Bridge St, Dingle, KerryJun 2025€725,000273 m
Apartment 9, Gort A Lin, John Street DingleJun 2026€240,000275 m
1 The Mall, Dingle, Co KerryFeb 2025€450,000316 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 January 2024
  2. Further information requested15 March 2024
  3. Further information received25 April 2024
  4. Decision due29 May 2024
  5. Decision issued28 May 2024
  6. Grant issued1 July 2024
  7. Permission expiry30 June 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.