Planning Permission Ireland
RefusedCommercialDecided 2 July 2025

Reenroe, Emlaghmore West, Ballinskelligs Co. Kerry

Redevelopment of a derelict hotel into a major tourism and leisure park in Ballinskelligs.

2460322 · Kerry County Council · Lodged 24 May 2024

Reference
2460322
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
24 May 2024

Summary

AI-generated

This large-scale development on a 28.5-hectare site involves the partial demolition, extension, and redevelopment of a derelict hotel into self-catering apartments, a bar, and restaurants. The wider site will feature 6 hobbit huts, 21 glamping pods, 25 holiday homes, 144 mobile homes, 20 campervan stands, a leisure complex with a pool, and a surf shop.

Commercialtourismglampinghotelleisure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development at a 28.5. 6ha site at reenroe, emlaghmore west, ballinskelligs, co. Kerry. The development will consist of an integrated tourism/ leisure park first comprising of the partial demolition, extension and redevelopment of the existing derelict hotel, to include; 4 no. Self-catering studio apartments; 3 no. One bed self-catering apartment; 15 no. Two beds self-catering apartments; a bar; dining room; rooftop restaurant; shop; esb substation and switch rooms; standby generator room, and bin stores. The remainder of the proposed development will include the following: 6 no. Hobbit huts, 21 no. Glamping pods, 25 no. Holiday homes, 144 no. Mobile homes, 20 no. Campervan stands, 0.8ha tent camping area, washroom and toilet facilities 58m2, maintenance building 618m2, leisure complex (with a swimming pool) 1,339.5m2, surf shop 191.7m2/café 126.5m2, natural play area, central park area, 151 no. Car parking spaces, including coach parking, 40 no. Bicycle spaces, ev charging points, internal roads, footpaths, waste storage areas, widening of beach access road to 6m for two-way traffic including a pedestrian/cycle pathway, upgrading of existing cliff walk, new access road and services lines to two neighbouring dwellings to the southwest of the development site, new wastewater treatment system with clear water pump station and uv system and associated constructed integrated wetland, site drainage, 2 no. Standby generators, water services and landscaping. The project includes all ancillary and associated works necessary to facilitate the development. An environmental impact assessment report has been prepared in respect of the proposed development and accompanies this application.

Key dates

Timeline

  1. Application received24 May 2024
  2. Further information requested18 July 2024
  3. Further information received5 December 2024
  4. Decision due2 July 2025
  5. Decision issued2 July 2025
  6. Appeal submitted29 July 2025
  7. Appeal decided11 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.