Planning Permission Ireland
GrantedCommercialDecided 16 December 2024

Main Street, Lacka East Ballyduff, Co. Kerry

Construction of a new fuel filling station with two pump islands, a canopy, and underground storage tanks.

2460422 · Kerry County Council · Lodged 2 July 2024

Reference
2460422
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
2 July 2024

Summary

AI-generated

The project proposes a new fuel filling station adjacent to an existing convenience shop, featuring two dispenser pump islands with a canopy. It includes underground storage tanks, a car park layout with one EV charging space, a petrol interceptor, and a one-way access-egress system.

Commercialfilling stationcommercialev charginginfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • We, the applicants, wish to apply for planning permission for new proposed fuel filling station at site located at main street, lacka east, ballyduff, co. Kerry. Proposed works
  • Construction of new fuel filling station consisting of 2 no. Dispenser pump islands, dispensing fuel on each side, with canopy over, ancillary to the exiting convenience shop adjacent to the subject site
  • Installation of new underground storage fuel tanks, and all associated fuel pipework, off-fill points and vents
  • Construction of associated car park layout with provision of 1 no. Ev charging space
  • Concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new class a petrol interceptor
  • Alterations to exiting site entrances, to provide a one way access-egress system to & from the site from public road, including alterations to existing boundary wall, and all associated road safety improvement works
  • Installation of new signage on site, consisting of new totem sign and general signage located on the forecourt canopy
  • Construction of all associated site features including landscaping and boundary treatments, public lighting and all associated site works

Land-use zoning

What this land is zoned for

Mixed UseRE
Mixed use general development

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Listowel Municipal District Local Area Plan 2020-2026 (2020–2026). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
24 Tower Dr, Ballyduff, TraleeJun 2025€225,000203 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 July 2024
  2. Further information requested23 August 2024
  3. Further information received31 October 2024
  4. Decision due18 December 2024
  5. Decision issued16 December 2024
  6. Grant issued27 January 2025
  7. Permission expiry26 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.