GrantedCommercialDecided 24 August 2017

Zone C, Mullingar Business Park, Mullingar

Construction of a new service station, retail shop, deli, and a standalone fuel storage depot.

166247 · Westmeath County Council · Lodged 12 October 2016

Reference
166247
Authority
Westmeath County Council
Register status
Decided
Type
PERMISSION
Received
12 October 2016

Summary

AI-generated

Permission is sought for a single-storey commercial building containing a retail outlet and deli sit-down area, alongside a five-pump refuelling forecourt with a canopy and underground tanks. The development also includes a standalone fuel storage depot with four above-ground bunded tanks, access roads, and security gates.

Commercialpetrol stationretailfuel depot
Storey
1
Floor area
460 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of one number single storey commercial building containing a retail outlet with sit down area for shop/deli, incorporating toilets, shop storage area and office, measuring 180.4 m sq. Permission is also sought for five number refuelling pumps with adjacent forecourt measuring 282.3 m sq with canopy overhead and 3 no. Underground fuel storage tanks containing diesel, petroleum and kerosene and green diesel (40,000 litres in total) permission is also sought for advertisement signage measuring a total of 17.69 sq m. Permission is also sought for the construction of: one number stand alone fuel storage depot measuring 279.5 , sq and to install four number above ground fuel storage tanks (54,000 litres in total) containing kerosene, gas oil and diesel, surrounded by an impermeable concrete bund and for drainage channel connected to a petrol interceptor. Permission is also sought to install an access road to the proposed buildings with electrical gates to the fuel store and bund tank and permission for an entrance on to the adjoining public road. Permission is also sought to install petrol interceptors for the surface water drainage system from the site and to discharge into existing services, adjacent to the site and the public road and for connection to the main sewer line adjacent to site and for the upgrading and completion of the existing public road ,and all associated site works, appropriate assessment screening report and stage 2 natura impact statement submitted.

Land-use zoning

What this land is zoned for

Enterprise & EmploymentSI
Provide for Enterprise & Employment and related uses including industrial and service uses including compatible uses such as office and distribution.

National zoning type: Industrial, enterprise, employment

Objective set by the MLAP 2014-2021 (2014–2025). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received12 October 2016
  2. Further information requested5 December 2016
  3. Further information received3 July 2017
  4. Decision due27 August 2017
  5. Decision issued24 August 2017
  6. Grant issued4 December 2017
  7. Permission expiry3 December 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.