Planning Permission Ireland
GrantedHousing estateDecided 5 June 2020

Phase 3, Oldtown Mill, Celbridge

Construction of 75 residential units at Oldtown Mill, Celbridge.

191282 · Kildare County Council · Lodged 18 November 2019

Reference
191282
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
18 November 2019
Residential units
75
Floor area
8051.2 m²

Summary

AI-generated

This planning application is for Phase 3 of the development, consisting of 51 two-storey houses and 24 duplex/apartment units. The project includes a new vehicular and pedestrian access, public open space, and associated infrastructure on a site of approximately 2.3 hectares.

Housing estatehousing estateduplexesapartments

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The construction of 75 no. Residential dwellings consisting of 51no. Two storey houses; 12 no. 2 bed own door duplex units contained in a three-storey block (block
  • And 12 no. Own door/duplex apartment units (6 no. 2 bed duplex units and 6 no. 1 bed apartment units) contained in a two storey block (block 2). The proposed house units are comprised of 5 no. 4 bed, end of terrace units (type a2); 17 no. 3 bed, semi-detached and end of terrace units (type b1); 21 no. 3 bed, mid-terrace units (types b2 and b5) and 8 no. 3 bed, end of terrace units (type b4 and b4.1). The proposed development also includes the creation of a vehicular and pedestrian access from the oldtown mill road with associated works; together with ancillary exterior bin and bike storage for the duplex/apartment blocks; public open space; internal roads; car parking; infrastructure; boundary treatments and all associated site and development works on a site measuring approx. 2.2ha. Revised by significant further information consisting of; (a) revision of the red line boundary of the site and an increase in the overall site area (increase from approx. 2.2 ha to approx. 2.3 ha) to accommodate the removal of a portion of a hedgerow along the southern boundary of the site; (b) revision of the proposed unit mix due to the replacement of 2 no. Three-bedroom houses (reduction from 46 to 44 no. 3 bed units) with 2 no. Four-bedroom houses (increase from 5 to 7 no. 4 bed units); (c) together with associated and ancillary revisions to the site layout and levels, boundary treatment, landscaping, internal storage within the proposed house units, bin storage provision, parking provision, drainage and services infrastructure and all associated site and development works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 31 January 2022. A completion certificate was lodged on 1 November 2024.

Notified floor area: 1,369.65

12 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
45 The Paddock Old Town Mill, Celbridge, KildareMay 2026€425,000116 m
60 The Paddocks, Celbridge, KildareApr 2025€351,000118 m
59 The Paddocks, Oldtown Mill, CelbridgeMay 2026€365,000118 m
34 Ballygoran View, Celbridge, Co KildareApr 2026€437,500186 m
20 Thornhill Heights, Celbridge, KildareDec 2025€455,000221 m
63 The Meadows, Oldtown Mill, CelbridgeDec 2025€355,000224 m
27 The Meadows, Oldtown Mill, CelbridgeMar 2026€400,000254 m
78 Thornhill Gardens, Celbridge, Co KildareSept 2025€435,000259 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 November 2019
  2. Further information requested17 January 2020
  3. Further information received26 March 2020
  4. Decision due22 April 2020
  5. Decision issued5 June 2020
  6. Grant issued21 July 2020
  7. Permission expiry20 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.