GrantedEnergyDecided 15 October 2020

Furryhill and Kilteel Lower, near Kilteel, Co. Kildare

Amendments to an approved solar farm development near Kilteel.

20969 · Kildare County Council · Lodged 26 August 2020

Reference
20969
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
26 August 2020

Summary

AI-generated

Permission is sought to amend the design of an approved solar photovoltaic panel array on a 31.24-hectare site near Kilteel, Co. Kildare. The changes include an optimised panel configuration, increasing the buffer distance under an overhead electricity line, and increasing the solar panel area.

Energysolarrenewable energyamendment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amend the design of the approved development (kildare county council planning reg. Ref. 17684 & an bord pleanála reg. Ref. Pl09.249155) which comprises planning permission for the development of a solar photovoltaic panel array consisting of the following; up to an area of 92,400 m² of solar panels on ground mounted steel frames within a site area of 31.24 hectares; a fenced electricity substation compound to include 1 no. Electricity control building and hardstands for ancillary electrical equipment; 10 no. Inverter/transformer units; underground cable and ducts; internal access tracks and hardstanding areas; boundary security fence; cctv and all associated site services and works, the existing access to the lands at the public road will be used for construction and operational purposes. Planning permission is sought for a period of 10 years. Amendments proposed are: optimised solar pv panel configuration located within the same areas of the site as previously permitted with the exception of an increased buffer distance under existing 38kv overhead electricity line from 14m to 34m; an increase in the solar panel area from the permitted up to 92,400 m² of solar panels to up to 157,000 sq. M of solar panels and; increase in height of solar panel array from the permitted up to 2.8m to up to 3.2m. Modifications and enlargement to the permitted on-site substation building and substation compound. The substation building will increase in size from c. 80 sqm as permitted to c. 150 sqm with an increase in height from c. 5.8m as permitted to c. 6.0m and the substation compound will increase in size from c. 700 sqm as permitted, to c. 1081 sqm; permission is also sought to amend the operational lifespan of the consented development from 25 years to 30 years

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Furryhill, Rathmore, NaasOct 2025€745,000397 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 August 2020
  2. Decision due20 October 2020
  3. Decision issued15 October 2020
  4. Grant issued23 November 2020
  5. Permission expiry22 November 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.