Turf Bog Lane, Badgerhill, Rathcoole, Co. Dublin
Installation of a 445-meter grid connection along Turf Bog Lane in Rathcoole.
ED19/0023 · South Dublin County Council · Lodged 22 July 2019
- Reference
- ED19/0023
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Declaration of Exemption Section 5
- Received
- 22 July 2019
Summary
AI-generatedThis application seeks a Section 5 Declaration of Exemption for a grid connection. The proposed works will run for approximately 445 meters along Turf Bog Lane in Rathcoole.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Grid connection along turf bog lane for c. 445m.
Key dates
Timeline
- Application received22 July 2019
- Decision due18 August 2019
- Decision issued15 August 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Refused30 m away
A solar photovoltaic panel array consisting of the following; up to an area of 92,400m2 of solar panels on…
Furryhill and Kilteel Lower , near Kilteel , Co. Kildare
17684KildareLodged 12 Jun 2017Energy
- Granted410 m away
Amend the design of the approved development (Kildare County Council Planning Reg. Ref.17684 & An Bord…
Furryhill and Kilteel Lower , near Kilteel , Co. Kildare
20969KildareLodged 26 Aug 2020Energy
- Granted460 m away
Consist of — Removal of the existing single storey utility room to the side
Furryhill , Rathmore , Co.Kildare
2660079KildareLodged 28 Jan 2026Extension
- Granted490 m away
Widening existing entrance gate to 3.4m and setting back by 3.5m with splayed entrance. Part replacement of…
23 Wyngate , Furry Hill , Rathmore
181064KildareLodged 30 Aug 2018Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionInfrastructure
Development of a grid connection which will consist of the construction of approximately 555 metres of…
Turagh & Tuogh , Cappamore , Co. Limerick
211172LimerickLodged 18 Aug 2021
- GrantedEnergy
Development of a grid connection from the permitted windfarm at Tawnamore, Co. Sligo (Ref: PL 21.241637) to…
Tawnamore Caltragh , Tawnalaghta Carns , and Cloonkeelaun
16422SligoLodged 1 Nov 2016
- GrantedInfrastructure
A new grid connection route connecting the permitted Ballylongford windfarm (Kerry County Council planning…
Townlands of Aghanagran Lower , Ballyline West Kilgarvan Coolkeragh and Tullamore , Co. Kerry
2360050KerryLodged 20 Jul 2023
- GrantedInfrastructure
PERMISSION FOR DEVELOPMENT CONSISTING OF c.390m of 0.45m WIDE UNDERGROUND 20kV ELECTRICITY CABLE TRENCH AND…
BRACKLOONAGH SOUTH , CHARLESTOWN , CO. MAYO
17737MayoLodged 12 Sept 2017
- Awaiting decisionInfrastructure
To construct an overhead and underground 20kV grid connection from Booltiagh 110kV substation in the townland…
Kiltumper Tld , Co. Clare
1787ClareLodged 9 Feb 2017
- Awaiting decisionInfrastructure
A ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid…
Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary
211097TipperaryLodged 27 Jul 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.