Planning Permission Ireland
GrantedHousing estateDecided 14 January 2022

Railpark, Celbridge Road, Maynooth

Construction of 58 residential units, including 34 houses and 24 duplex apartments, as Phase 1 of a larger masterplan.

21155 · Kildare County Council · Lodged 10 February 2021

Reference
21155
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
10 February 2021
Residential units
46
Floor area
5569.8 m²

Summary

AI-generated

This application represents Phase 1 of a residential masterplan, proposing 58 dwellings on a 2.18 ha site. The mix includes 34 houses (two and three storeys) and 24 duplex apartments across three storeys, alongside new access infrastructure on Celbridge Road.

Housing estatehousing estateduplexapartments
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development on this 2.18 ha site, approximately, at lands adjoining an existing residential development (rockfield park), railpark, celbridge road, maynooth, co. Kildare. (this forms phase 1 of a residential masterplan for some 105 no. Units in total on a wider c. 3.26 ha landholding under the applicant’s control). The proposed phase 1 development will consist of: construction of a residential development comprising 58 no. Dwellings in total, consisting of 18 no. Two-bedroom two storey houses, 14 no. Three-bedroom three storey houses and 2 no. Four-bedroom three storey houses (34 no. Houses in total) including rear private open spaces; 12 no. One-bedroom apartments and 12 no. Two-bedroom apartments (24 no. Three storey duplex apartments in total), including balconies. The development will also include: new vehicular, cyclist and pedestrian access from celbridge road; a new pedestrian footpath and cycle track along the main site frontage to celbridge road; the provision of future access connection points to adjacent lands to the northeast (phase 2), northwest and the southeast; works to facilitate connections to existing services infrastructure to the northeast via phase 2 lands. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, and bicycle store areas; parking at surface level (117 no. Total spaces for car parking and 30 no. Bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to celbridge road, changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground

Land-use zoning

What this land is zoned for

New ResidentialR1
To provide for new residential development.

National zoning type: New/proposed residential

Objective set by the Maynooth and Environs Joint Local Area Plan 2025 - 2031 (2025–2031). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Rockfield Park, Maynooth, KildareMay 2025€550,000154 m
16 Rockfield Park, Maynooth, KildareJan 2026€660,000216 m
39 Green Field Dr, Maynooth, KildareJun 2025€530,000261 m
128 Griffin Rath Hall, Celbridge Rd, MaynoothJan 2026€445,000266 m
129 Griffin Rath Hall, Maynooth, KildareApr 2025€444,000272 m
15 Maynooth Park, Maynooth, KildareSept 2025€429,000292 m
139 Griffin Rath Manor, Celbridge Rd, MaynoothDec 2025€456,500328 m
11 Rockfield Close, Maynooth, KildareDec 2025€715,000330 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 February 2021
  2. Further information requested31 March 2021
  3. Further information received10 December 2021
  4. Decision due15 January 2022
  5. Decision issued14 January 2022
  6. Grant issued13 February 2024
  7. Appeal submitted9 February 2022
  8. Appeal decided13 February 2024
  9. Permission expiry12 February 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.