Planning Permission Ireland
GrantedHousing estateDecided 14 January 2022

Railpark, Celbridge Road, Maynooth

Construction of 47 residential units and a single-storey crèche as Phase 2 of a residential masterplan.

21156 · Kildare County Council · Lodged 10 February 2021

Reference
21156
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
10 February 2021
Residential units
21
Floor area
2592.5 m²

Summary

AI-generated

This Phase 2 development proposes 47 dwellings on a 1.99 ha site, consisting of 21 houses and 26 duplex apartments. The project also includes a single-storey crèche facility measuring approximately 261 sqm and access connections through Phase 1.

Housing estatehousing estatecrecheduplex
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development on this 1.99 ha site, approximately, at lands adjoining an existing residential development (rockfield court), railpark, celbridge road, maynooth, co. Kildare. (this forms phase 2 of a residential masterplan for some 105 no. Units in total on a wider c. 3.26 ha landholding under the applicant’s control). The proposed phase ii development will consist of: construction of a residential development comprising 47 no. Dwellings in total, consisting of 11 no. Two-bedroom two storey houses and 10 no. Three-bedroom three storey houses (21 no. Houses in total) including rear private open spaces; 13 no. One bedroom apartments and 13 no. Two-bedroom apartments (26 no. Three storey duplex apartments in total), including balconies and a single storey crèche facility (c. 261 sqm). The development will also include: new vehicular, cyclist and pedestrian access from celbridge road via currently undeveloped lands to the southwest (phase 1); a new pedestrian footpath and bicycle track along the site frontage to celbridge road; the provision of future access connection points to adjacent lands to the southwest (phase 1), north and the southeast; works to facilitate connections to existing services infrastructure in rockfield park to the west. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, children’s play area and bicycle store areas; parking at surface level (95 no. Total spaces for car parking and 33 no. Bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to celbridge road; changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground

Land-use zoning

What this land is zoned for

New ResidentialR1
To provide for new residential development.

National zoning type: New/proposed residential

Objective set by the Maynooth and Environs Joint Local Area Plan 2025 - 2031 (2025–2031). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Rockfield Park, Maynooth, KildareMay 2025€550,00081 m
16 Rockfield Park, Maynooth, KildareJan 2026€660,000150 m
11 Rockfield Close, Maynooth, KildareDec 2025€715,000260 m
15 Maynooth Park, Maynooth, KildareSept 2025€429,000267 m
12 Rockfield Close, Maynooth, KildareMay 2025€690,000268 m
39 Green Field Dr, Maynooth, KildareJun 2025€530,000282 m
20 Greenfield Dr, Maynooth, KildareMar 2025€395,000330 m
26 Rockfield Green, Maynooth, KildareJan 2026€580,000334 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 February 2021
  2. Further information requested31 March 2021
  3. Further information received10 December 2021
  4. Decision due15 January 2022
  5. Decision issued14 January 2022
  6. Grant issued13 February 2024
  7. Appeal submitted10 February 2022
  8. Appeal decided13 February 2024
  9. Permission expiry12 February 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.