RefusedEnergyDecided 18 March 2021

Ummeras Beg, Coolatogher Mullaghroe Lower, Ummeras More and Coolsickin/Quinsborough

Construction of a 5-turbine wind farm with a tip height of up to 169m and associated infrastructure.

2184 · Kildare County Council · Lodged 22 January 2021

Reference
2184
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
22 January 2021

Summary

AI-generated

The development includes 5 wind turbines, an on-site electrical substation, a temporary construction compound, underground cabling, access tracks, and a 100m meteorological mast. Permission is sought for a 10-year construction period and a 30-year operational life.

Energywind farmrenewableenergyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

5 no. Wind turbines with a tip height of up to 169m and all associated foundations and hardstanding areas; 1 no. On-site electrical substation; 1 no. Temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and associated drainage; erection of 1 no. Permanent meteorological mast of up to 100m in height; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. A concurrent planning application is being submitted to offaly county council in relation to the elements of the proposed development that are within county offaly, which consist of road/junction accommodation works to facilitate the turbine deliveries associated with the proposed wind farm development in co. Kildare. An environmental impact assessment report (eiar) and a natura impact statement (nis) have been prepared in respect of the proposed development. All within the townlands

Key dates

Timeline

  1. Application received22 January 2021
  2. Decision due18 March 2021
  3. Decision issued18 March 2021
  4. Appeal submitted14 April 2021
  5. Appeal decided8 November 2021

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.