Planning Permission Ireland
RefusedEnergyDecided 2 September 2025

Tinwear Archerstown and Durrow, Co. Laois

Construction of two 175-metre-tall wind turbines and associated infrastructure.

2560414 · Laois County Council · Lodged 9 July 2025

Reference
2560414
Authority
Laois County Council
Register status
Appealed
Type
PERMISSION
Received
9 July 2025

Summary

AI-generated

The development consists of two wind turbines with a tip height of 175 metres, a rotor diameter of 150 metres, and a hub height of 100 metres. It includes road upgrades, underground cabling to an off-site substation, hedgerow removal, and biodiversity management. A 10-year planning permission and 35-year operational life are being sought.

Energywind energyturbinesinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

I. Construct 2 no. Wind turbines with an overall turbine tip height of 175 metres; a rotor blade diameter of 150 metres; and hub height of 100 metres, and associated foundations and hard standing areas; ii. Upgrade of existing tracks and roads and the provision of new site access roads; iii. Underground electrical and communications cabling connecting the wind turbines to a proposed 38kv on-site substation located in the townland of ballynaslee co. Kilkenny; iv. Accommodation works along the n77 national secondary road in the townland of durrow townparks, co. Laois to facilitate the delivery of turbine components and other abnormal sized loads; v. Hedgerow removal; vi. Biodiversity management and enhancement plan measures (including establishment of new hedgerow, translocation of existing hedgerow and enhancement of existing hedgerow); vii. Spoil management; viii. Site drainage; ix. Operational stage site signage; and, x. All associated site development works, ancillary works and apparatus. A 10-year planning permission and 35-year operational life from the date of commissioning of the entire wind farm is being sought. An environmental impact assessment report (eiar) and natura impact statement (nis) accompany this planning application

Key dates

Timeline

  1. Application received9 July 2025
  2. Decision due2 September 2025
  3. Decision issued2 September 2025
  4. Appeal submitted29 September 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.