Planning Permission Ireland
Awaiting decisionRetention

Ballysax, The Curragh, Co. Kildare.

Retention and expansion of an end-of-life vehicle storage and scrap metal recovery facility at The Curragh.

221366 · Kildare County Council · Lodged 16 November 2022

Reference
221366
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
16 November 2022

Summary

AI-generated

The application seeks permanent permission for a 3.47-hectare vehicle storage yard and retention of gravel hardcore, storage containers, and a depolluting building. It also requests permission to double the annual vehicle intake to 5,000, complete a workshop extension, and build a battery storage building.

Retentionindustrialwasteretentionbattery storage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: (a) permanent permission for use of existing lands (3.47 ha) for the storage of elv’s (end of life vehicles). (b) retention permission for gravel hardcore of 0.667 ha of lands for storage of elv’s (end of life vehicles), 3 no. Steel storage containers on site, retention of existing depolluting building as constructed which consists of 4 no. Steel containers incorporated into the depolluting building, landscaped berms around perimeter of site as constructed. (c) permission to increase the annual intake of vehicles from 2500 vehicles to 5000 vehicles. (d) retention permission for the construction and completion of partially constructed extension to previously granted workshop building. (e) permission for the construction of a detached electric battery storage building. (f) permission for ancillary use on site for the reception, storage and recovery of scrap metal arising from elv’s namely ewc codes: 17 04 01 (copper, bronze, brass), 17 04 02 (aluminium), 17 04 03 (lead), 17 04 05 (iron and steel), 17 04 07 (mixed metals), 17 04 11 (cables other than those mentioned in 17 04 10), 16 01 03 (end-of-life tyres), 16 01 04 a (end-of-life vehicles less than 3.5 tonnes), 16 01 04 b (end-of-life vehicles greater than 3.5 tonnes), 16 01 06 (end-of-life vehicles, containing neither liquids nor other hazardous components, 16 01 07 (oil filters), 16 01 07 (explosive components – for example air bags), 16 01 12 (brake pads other than those mentioned in 16 01 11), 16 01 13 (brake fluids), 16 01 15 (anti-freeze fluids other than those mentioned in 16 01 14), 16 01 15 (tanks for liquified gas, 16 01 17 (ferrous metal), 16 01 18 (non-ferrous metal), 16 01 19 (plastic), 16 01 20 eow (glass including eow glass), 16 01 21 (hazardous components other than those mentioned in 16 01 07 to 16 01 11 and 16 01 13 and 16 01 14 (including a/c fluid r134a, r1234yf, r12 and r456a,16 01 22 (components not otherwise specified), 16 02 11 (non-household waste fridges and freezers and other devices containing hcfc, hfc, 16 02 16 (components removed from discarded equipment other than those mentioned in 16 02 15), 16 06 01 (lead batteries), 16 06 02 (nicd batteries), 16 06 03 (mercury containing batteries), 16 06 05 (other batteries and accumulators), 16 08 01 (spent catalysts containing gold, silver, rhenium, rhodium, palladium, iridium or platinum - except 16 08 07), 16 08 03 (spent catalysts containing transition metals or transition metal compounds not o

Key dates

Timeline

  1. Application received16 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.