Planning Permission Ireland
GrantedIndustrialDecided 13 June 2023

Monread Road, Maudlings Townland, Naas

Demolition of existing buildings and construction of two large warehouse and logistics buildings.

221478 · Kildare County Council · Lodged 14 December 2022

Reference
221478
Authority
Kildare County Council
Register status
Appealed
Type
PERMISSION
Received
14 December 2022

Summary

AI-generated

The development involves the demolition of existing dwellings and barns on a 4.8-hectare site. It will be replaced by two large warehouse/logistics buildings with ancillary offices, dock levellers, and roof-mounted solar panels.

Industrialwarehouselogisticsdemolitionsolar
Floor area
17,174 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development on lands measuring 4,829 hectares between the m7 motorway and monread road at monread road, maudlings (townland), naas, co. Kildare (adjacent to the globe retail park): the development will consist of: demolition of all existing buildings on the site including dwellings and barns (in ruins) and barn (c. 1,126sqm). Construction of 2 no. Buildings for warehouse/logistics use (buildings a1 and a2). Building a1 will have a gross floor area of 5,072sq. M and will measure 14.895m high (from ground level to parapet level). It will have 2 storey ancillary offices (including reception, toilets and canteen), 2 no. At-grade doors, 6 no. Dock levellers, internal plant at second floor level, elevation signage (2 no. ), roof mounted solar panels and ground level air conditioning units. Building a2 will have a gross floor area of 12,102sq. M and will measure 14.895m high (from ground level to parapet level). It will have 2 storey ancillary offices (including reception, toilets and canteen) 4 no. At-grade doors, 15 no. Dock levellers, internal plant at second floor level, elevation signage (2 no. ), roof mounted solar panels and ground level air conditioning units. The proposed development includes a replacement access off monread road, widening of the monread road to accommodate a proposed additional lane (right turn pocket), new road markings, 172 no. Car parking spaces (including disabled spaces and ev spaces), 108 no. Cycle parking spaces. All associated siteworks including new vehicular entrance, drainage infrastructure, 1 no. Esb substation, 2 no. Bin stores and 2 no. Recycle stores, boundary treatments, landscaping, service yards, internal roads, footpaths and cycle lane, lighting, internal gates, noise barrier, retaining walls to the west of unit a2 and fire tender access route

Land-use zoning

What this land is zoned for

Industry and WarehousingBP
To provide for industry, manufacturing, distribution and warehousing.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Naas Local Area Plan 2021 - 2027 (2021–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
229a Aylmer Park, Naas, Co KildareOct 2025€258,000181 m
206 Aylmer Park, Naas, Co Kildarenot full market priceJul 2025€400,000188 m
186 Aylmer Park, Naas, Co KildareMar 2025€440,000259 m
247 Aylmer Park, Naas, Co KildareJan 2025€620,000276 m
3b Maryfield Court, Monread Rd, NaasApr 2025€250,000325 m
16 B Maryfield Court, Monread Rd, NaasDec 2025€361,000325 m
16 B Maryfield Court, Monread Rd, NaasJun 2026€358,000325 m
161 Aylmer Park, Naas, Co KildareJul 2025€470,000339 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 December 2022
  2. Further information requested15 February 2023
  3. Further information received19 May 2023
  4. Decision due15 June 2023
  5. Decision issued13 June 2023
  6. Grant issued16 October 2023
  7. Appeal submitted10 July 2023
  8. Permission expiry15 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.