Planning Permission Ireland
GrantedCommercialDecided 7 March 2025

former Cemex site at Maudlins roundabout, Dublin Road Link with Fishery Lane, Naas

Demolition of existing buildings for a new EV charging hub, distribution centre, and service station in Naas.

2460574 · Kildare County Council · Lodged 25 June 2024

Reference
2460574
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
25 June 2024

Summary

AI-generated

The development involves the demolition of existing buildings to construct an Electric Vehicle Charging Hub for 36 vehicles and 8 EV bus/HGV spaces. It also includes a large single-storey distribution centre, a service station with food offers, and a drive-thru café.

Commercialev charginglogisticsdemolition
Floor area
10,528 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For demolition of all existing buildings on the site (c. 9,949sq. M) and north and north-western boundary wall. Provision of new electric vehicle charging hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. Ev bus/hgv charging spaces. Construction of 8 no. Buildings (total gfa 10,527.59sq. M) as follows: distribution centre: single storey structure including offices (gross floor area 9,383.85sq. M) with a maximum height of 19.5m. It includes 13 no. Loading bays, service station – single storey building (759.5sq. M) including net retail area of 99.7sq. M, 3 no. Food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq. M) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq. M). External generator (gfa 37.58sq. M) service compound (gfa 37.58sq. M) water pump house (gfa 12sq. M) refuse compound (gfa 6.84sq. M) there will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, hgv fuel pumps (5.6m high), modified vehicular entrance off maudlins roundabout, replacement entrance off johnstown road with new slip lane, new spine road, car parking (169 – including ev parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), hgv/bus parking (16 no. – including 8 no. Ev parking spaces, hgv only parking 3 no. ), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of kildare county council as part of the key development area master plan and access strategy agreed with kildare county council, to include
  • Provision of a left slip lane from the r445 (dublin road) to the monread road at the dublin road roundabout

Land-use zoning

What this land is zoned for

Mixed UseSI
To provide for general commercial / industrial / enterprise uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Naas Local Area Plan 2021 - 2027 (2021–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received25 June 2024
  2. Further information requested14 August 2024
  3. Further information received10 February 2025
  4. Decision due9 March 2025
  5. Decision issued7 March 2025
  6. Grant issued17 April 2025
  7. Appeal submitted3 April 2025
  8. Permission expiry16 April 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.