Planning Permission Ireland
GrantedInfrastructureDecided 27 March 2023

Cross and Passion College, Main Street, Kilcullen

Phased demolition and construction of a new school building up to three storeys.

22993 · Kildare County Council · Lodged 12 August 2022

Reference
22993
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
12 August 2022

Summary

AI-generated

The development consists of the phased demolition of existing school buildings, excluding a former convent and stone building which will be refurbished. It includes temporary school units and the construction of a new two- and three-storey school building of over 10,000 square meters.

Infrastructureschooldemolitionredevelopment
Storeys
3
Floor area
10,006 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) the phased demolition of existing school buildings, with the exception of the existing cross and passion former convent building (1,333m²) and nearby stone building (76m²), which are to be retained and refurbished; (2) to allow the school to remain operational during the construction period, the erection on site of new temporary school accommodation units (1,517m² ) along with the retention of the existing temporary school accommodation units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms; (3) the phased construction of a new 2- and 3-storey school building with a total gross internal floor area of 10,005.7m² (the total new school floor area incorporating refurbished elements is 11,414.7m²) incorporating 37 no. General classrooms, a series of support and specialist classrooms, a special needs unit, a library, multi media rooms, a single storey multi-use sports hall, staff rooms and all ancillary accommodation including photovoltaic panels at roof level, externally accessible storage shed (33.5m²) and plant (42.5m²) within the retained and refurbished stone building, and separate bin enclosure (25m²); (4) the new school grounds will comprise the existing grassed sports pitch, which is to be retained, and the construction of 6 no. Multi-use hard ball courts, outdoor seating and breakout areas, a sensory garden, a construction studies yard, and associated hard and soft landscaping including the retention of the majority of existing trees on site including the existing woodland area along the r413, which is to have the addition of a woodland trail and seating area; (5) the retention of existing vehicular and pedestrian access arrangements from the r413 and the r448/main street, the provision of new pedestrian access arrangements through the site between main street and the community centre/sports grounds to the south of the school, the modification of the internal roadway and the provision of 92 no. Car parking spaces (including 5 no. Disabled parking spaces and 2 no. Ev charge point spaces) and 177 no. Bicycle parking stands providing 354 no. Parking spaces; (6) the proposal also includes new foul and surface water drainage system works incorporating pump station, soakaways, suds measures, rainwater harvesting, a new substation (28m²), liquid petroleum gas (lpg) and air source heat pump (ashp) compounds and all other associated site and development works

Land-use zoning

What this land is zoned for

Community and EducationCI
To provide for community and educational facilities.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Kildare County Development Plan 2023 - 2029 - Kilcullen Settlement Plan (2025–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2, Convent View, Athy RdNov 2025€195,000137 m
Flat 5 Convent View, Main Street, KilcullenApr 2026€200,000137 m
1 Abbey Grove, Newbridge Rd, KilcullenDec 2025€270,000199 m
1989 St Brigids Ave, Kilcullen, KildareDec 2025€310,000215 m
1 Ballyshannon, Kilcullen, KildareJan 2025€565,000225 m
73, Riverside Manor, Kilcullenprice excludes VATMay 2025€374,449225 m
2 New Abbey Road, Kilcullen, Co KildareOct 2025€155,000251 m
1987 St Brigids Ave, Kilcullen, KildareJan 2025€282,050252 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 August 2022
  2. Further information requested4 October 2022
  3. Further information received3 March 2023
  4. Decision due30 March 2023
  5. Decision issued27 March 2023
  6. Grant issued22 May 2023
  7. Permission expiry21 May 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.