Planning Permission Ireland
GrantedInfrastructureDecided 9 October 2024

Former Magee Barracks Kildare Town, Kildare Town, Co. Kildare.

Phased construction of a new two-storey, 37-classroom post-primary school in Kildare Town.

2360321 · Kildare County Council · Lodged 24 October 2023

Reference
2360321
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
24 October 2023

Summary

AI-generated

The project involves the phased construction of a new two-storey, 37-classroom post-primary school (Curragh Community College) with a total floor area of approximately 10,883.8 sqm. The development includes sports facilities, car parking, a drop-off area, and solar panels on the roof.

Infrastructureschooleducationsolar
Storeys
2
Floor area
10,884 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For the phased construction of a new 2 storey, 37 classroom post primary school (curragh community college) with a total floor area of circa 10,883.8sqm along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining kildare town educate together and gaelscoil mhic aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of kildare town educate together and gaelscoil mhic aodha, photovoltaic panels on roof, circa 135m length of access road from melitta rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c. 4,982sqm of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and gp hall / dining space (to be converted to specialist classrooms in phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 no. Ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c. 5901.8 sqm of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a pe hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 no car parking spaces, additional bicycle parking, an sen garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (phase
  • Drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for kildare town educate together, adjustment to existing car parking and 1 additional ballcourt for gaelscoil mhic aodha, a service access off the existing access road to the south east along with circa 135m length of access road from melitta rd and all ancillary site development works. Revised by significant further information which consists of: alteration

Land-use zoning

What this land is zoned for

Mixed UseRE
To provide for commercial, educational, residential and community uses.

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Kildare Town Local Area Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 Melitta Park, Kildare, KildareDec 2025€360,000102 m
46 Melitta Park, Kildare, KildareJan 2026€519,423108 m
27 Melitta Park, Kildare, KildareOct 2025€375,000112 m
51 Melitta Park, KildareDec 2025€445,000189 m
23 Ruanbeg Crescent, Kildare, KildareAug 2025€290,000193 m
15 Ruanbeg Green, Ruanbeg Manor, KildareJul 2025€427,000199 m
22 Ruanbeg Dr, Kildare Town, KildareMar 2026€398,000209 m
35 Ruanbeg Crescent, Ruanbeg Manor, KildareAug 2025€266,000213 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 October 2023
  2. Further information requested15 December 2023
  3. Further information received13 September 2024
  4. Decision due10 October 2024
  5. Decision issued9 October 2024
  6. Grant issued31 January 2025
  7. Appeal submitted31 October 2024
  8. Appeal decided31 January 2025
  9. Permission expiry30 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.