Planning Permission Ireland
GrantedInfrastructureDecided 16 May 2024

The townlands of Ballyvergal and Pollertown Little County Carlow and Knocknagee County Kildare, Kildare, County KIldare

Construction of a 38 kV electrical substation and underground cabling across Carlow and Kildare.

2460253 · Kildare County Council · Lodged 25 March 2024

Reference
2460253
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
25 March 2024

Summary

AI-generated

The development consists of a new 38 kV / MV electrical substation compound of approximately 2,850 square metres. It will feature a palisade fence, prefabricated modules, transformers, a 10-metre telecommunications pole, and associated underground cabling.

Infrastructuresubstationgridinfrastructure
Floor area
95 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a 38 kv / mv electrical substation, underground cables and associated works. The development will include the following elements - see site notice for full description due to limited characters here. 1)construction of a substation compound of approximately 2,850 m2 gross area, with 2.6 m high palisade fence around the entire perimeter of the substation, with the following electrical plant within the substation: 1 no. Prefabricated 38 kv gis module and foundation (c. 31m2 and c. 5.2 m high); 1 no. Prefabricated mv gis module and foundation (c. 32m2 and c. 4.7 m high); 1 no. Prefabricated control room module and foundation (c. 32m2 and c. 4.7 m high); 2 no. 38/20 kv 10 mva transformers and associated bunds (c. 15m2, c. 4.5 m high ea. ); telecommunication scada pole of c. 10 metres in height; associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; internal access road of c. 40 m in length and c. 5m wide within the proposed substation; compound lighting, boundary treatment, associated drainage, landscaping and all ancillary site development works; 2)use of a portion of the existing temporary road (c. 200 m in length) permitted as part of the recent msd rathgall development (planning ref: 21/360 & 22/110) for permanent use to facilitate access to the proposed substation; 3)construction of new stone wall, fencing and gates at the existing junction of the temporary road with the public road; 4)construction of an internal access road (c. 140 m in length) to the proposed substation extending from the existing temporary road on the msd lands to the proposed substation; 5)site clearance works related to the proposed substation compound and access road; 6)installation of c. 1.3 kilometres of double-circuit 38 kv underground cables (ugc) along the r448 road between the proposed substation and the existing carlow – graigue 38 kv ohl; 7)installation of c. 0.7 kilometres of single circuit 38 kv ugc along the r448 road between the proposed substation and the existing carlow – ballylinan 38 kv ohl; 8)installation of c. 0.3 kilometres of six circuit mv ugc along the r448 road between the proposed substation and the existing r448 roundabout; 9)installation of a new 12 m high steel lattice mast on the existing carlow – graigue 38 kv ohl; 10)replacement of an existing timber poleset (imp 1395) with a new 15 m high steel lattice mast on the existing carlow – ballylinan 38 kv ohl - this applicatio

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Ballyvergal, Palatine, Co. Carlownot full market priceJun 2026€225,000466 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 March 2024
  2. Decision due19 May 2024
  3. Decision issued16 May 2024
  4. Grant issued22 May 2025
  5. Appeal submitted11 June 2024
  6. Appeal decided22 May 2025
  7. Permission expiry21 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.