Maynooth 220kV Substation, Taghadoe, Co. Kildare

Major infrastructure expansion at Maynooth Substation, including new GIS buildings and demolition of a farmhouse.

2460364 · Kildare County Council · Lodged 25 April 2024

Reference
2460364
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
25 April 2024

Summary

AI-generated

The project involves constructing a new 220kV GIS building and a new 110kV GIS building, alongside power transformers, lightning masts, and line/cable interface towers. It also includes the demolition of an existing bungalow farmhouse and agricultural buildings.

Infrastructuresubstationgriddemolitioninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For the construction of infrastructure, and associated development, at the existing and planned expanded substation, comprising:-
  • Construction of a new 220 kv gas insulated switchgear (gis) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm)
  • Construction of a new 110kv gis building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138sqm)
  • Both of the gis buildings will have 8 no. Associated air rods on each of the roofs (3m in height)
  • Construction of 4 no. 220/110kv power transformers to include connections to the new gis buildings
  • 2 no. 220kv and 1 no. 110kv line/cable interface towers and associated removal of 3 no. Existing end masts
  • 3 no. Lightning masts (height 22m)
  • Cable connections to the 220kv gis building
  • New 4.5m wide internal access road and 10 no. New permanent car parking spaces
  • Associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank
  • Associated demolition of existing bungalow farmhouse and agricultural buildings (1,111.6m2 floorspace total) to facilitate the proposed development; and
  • All ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing derryiron-maynooth 110kv overhead line. Planning permission is sought for a period of 10 years. A natura impact statement (nis) will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received25 April 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.