RefusedEnergyDecided 18 May 2022

Windgates, Co. Kildare.

Construction of a Synchronous Compensator grid stabilisation facility in Kildare.

211444 · Kildare County Council · Lodged 7 October 2021

Reference
211444
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
7 October 2021

Summary

AI-generated

The development on a 1.97-hectare site includes a High Inertia Synchronous Compensator building, an electrical container area, external coolers, transformers, and a Gas Insulated Switchgear compound with an underground grid connection.

Energyenergygridinfrastructure
Storey
1
Floor area
481 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A synchronous compensator (electricity grid stabilisation) development within the townland of windgates, co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 high intertia synchronous compensator (hisc) compound (0.25 hectares) consisting of 1 no. High intertia synchronous compensator (hisc) building enclosed within a steel clad framed, housed structure (12.1m max height and 481 m2) and supported by an electrical container area measuring 355m2 consisting of 8 no. Electrical equipment containers with a total area of (238m2), each container measuring 29.75m2, and an external cooler area measuring 180m2 consisting of 4 no. External cooler units, each one measuring 30.5m2, 1 auxiliary and start up static frequency converter sfc transformer, 1 generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank; a high voltage (hv) compound (0.11 hectares) consisting of main transformer and high voltage (hv) equipment; a gas insulated switchgear (gis) building compound and underground grid connection (0.25 hectares) consisting of 1 high voltage gas insulated switchgear compound (0.16 hectares), included within this compound is a hv gas insulated switchgear (gis) housed structure (13.5m max height and 458m2) and 220kv underground cable connection (188m in length) to adjacent (existing) 220kv eirgrid substation; upgrade to the existing site entrance onto the r406, internal access tracks, fencing, temporary construction compound, landscaping and drainage. Planning permission is sought for a period of 10 years. A natura impact statement (nis) accompanies this application. All within the townland of

Key dates

Timeline

  1. Application received7 October 2021
  2. Further information requested29 November 2021
  3. Further information received21 April 2022
  4. Decision due18 May 2022
  5. Decision issued18 May 2022
  6. Grant issued5 October 2023
  7. Appeal submitted9 June 2022
  8. Appeal decided5 October 2023
  9. Permission expiry4 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.