6 Ballymany Manor, Newbridge, Co. Kildare
Demolition of a kitchen annex to build a single-storey front, side, and rear extension.
2561231 · Kildare County Council · Lodged 29 October 2025
- Reference
- 2561231
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 29 October 2025
Summary
AI-generatedThe project involves removing an existing kitchen annex and replacing it with a single-storey front, side, and rear extension. The new extension will house a den, utility room, living area, kitchen, and shower room.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
To remove existing kitchen annex and replace with a single storey front, side and rear extension, comprising of a den / study, utility room, living area, kitchen and shower room, remove roof over front door and replace it with a flat canopy roof and all associated site works
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 13 Ballymany Manor, Newbridge, Kildare | May 2026 | €440,000 | 37 m |
| 22 Ballymanny Manor, Newbridge, Co Kildare | Jan 2025 | €200,000 | 86 m |
| 37 Ballymany Manor, Newbridge, Kildare | Nov 2025 | €455,000 | 138 m |
| 68b Rosetree Garden, Curragh Farm, Newbridgeprice excludes VAT | Mar 2025 | €303,965 | 156 m |
| 27 Stables Greeen, Curragh Farm, Ballymanyprice excludes VAT | May 2025 | €343,612 | 156 m |
| 64b Rosetree Garden, Curragh Farm, Newbridgeprice excludes VAT | Mar 2025 | €303,965 | 156 m |
| 29 Stables Green, Curragh Farm, Ballymanyprice excludes VAT | May 2025 | €392,070 | 156 m |
| 22 Stables Green, Curragh Farm, Ballymanyprice excludes VAT | May 2025 | €392,070 | 156 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received29 October 2025
- Decision due23 December 2025
- Decision issued11 December 2025
- Grant issued26 January 2026
- Permission expiry25 January 2031
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
(a) The construction of a single storey domestic extension with a floor area of 22m2 to the side and rear of…
8 Ballymany Manor , Newbridge , Co. Kildare
16400KildareLodged 21 Apr 2016Extension
- Granted40 m away
Of a small single storey extension to side of my house and all associated works
14 Ballymany Manor , Newbridge , Co. Kildare.
16112KildareLodged 10 Feb 2016Retention
- Granted60 m away
Extension to side and rear of my house and all associated works
11 Ballymany Manor , Newbridge , Co. Kildare.
19300KildareLodged 22 Mar 2019Extension
- Granted80 m away
For development to amend the previously permitted redevelopment of their site of approximately 0.39 hectares…
Maxol Service Station , Ballymany Moorefield , Newbridge
20556KildareLodged 3 Jun 2020Commercial
- Refused80 m away
Development at a petrol filling station site of approximately 0.39 hectares . The proposed development will…
Maxol Service Station , Ballymany Moorfield , Newbridge
2360374KildareLodged 13 Nov 2023Alterations
- Granted90 m away
(i) A 317sqm extension to the existing shop, deli and off licence, and the creation of a modernised shop,…
Maxol Service Station , Ballymany , Moorefield
181053KildareLodged 29 Aug 2018Commercial
- Granted90 m away
Extension to side of house
Laurel Lodge , Ballymany , Newbridge
19327KildareLodged 28 Mar 2019Extension
- Granted100 m away
To amend the previously permitted redevelopment of their site of approximately 0.39hectares (the “parent…
Maxol Service Station , Ballymany , Moorefield
191304KildareLodged 21 Nov 2019Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedExtension
To remove existing kitchen annex and replace with a new single storey ground floor extension at rear of…
4, Stratton Way, Adamstown Square, Lucan, Dublin, K78 T254
SDZ23A/0044South DublinLodged 27 Jun 2024
- GrantedExtension
Removal of existing single storey annex to front and rear of existing dwelling and the construction of a…
Orchardstown Lodge, Washington Lane, Rathfarnham, Dublin 14.
SD18B/0053South DublinLodged 15 Feb 2018
- GrantedExtension
For the removal of an existing single storey extension to the side and and rear and for the construction of a…
72, Moreen Avenue, Sandyford, Dublin 18
D06B/0563Dún Laoghaire–RathdownLodged 22 Jun 2006
- GrantedExtension
(1) the demolition of existing flat roof near annex, (2) the construction of a new single storey extension to…
No.1 New Road , Kileely , Co. Limerick.
18201LimerickLodged 6 Mar 2018
- GrantedExtension
To construct a New First Floor Extension to the side of existing dwelling and Single-Storey flat roof…
No. 59 Tournore Park , Abbeyside , Dungarvan
1911WaterfordLodged 14 Jan 2019
- GrantedExtension
Remove existing side porch, utility door and kitchen window, and erect a single storey front, side and rear…
1 Finlay Park , Naas , Co. Kildare W91 A0X8.
211130KildareLodged 6 Aug 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.