Planning Permission Ireland
GrantedRetentionDecided 12 January 2022

37 Shannon Cove, Dromod, Carrick on Shannon

Retention of window alterations and an enlarged hard-surfaced parking area at an existing house.

21232 · Leitrim County Council · Lodged 10 November 2021

Reference
21232
Authority
Leitrim County Council
Register status
Decided
Type
RETENTION
Received
10 November 2021

Summary

AI-generated

Retention permission is sought for unauthorised alterations to a previously approved extension. The works include an enlarged first-floor window opening on the rear facade, a window instead of double doors on the ground floor extension gable, and an additional hard-surfaced area to the front of the house.

Retentionretentionextensionwindow

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Consists of proposed retention of unauthorised development to extension of existing dwelling house (on foot of planning permission in respect of planning approval ref. P20/18 ), and comprising of : ( i ) existing window opening height enlarged at first floor level on the rear façade of the existing house, ( ii ) the installation of a window rather than the authorised double doors, to the gable of the ground floor extension to the northern façade of the existing house, ( iii ) the provision of an additional hard-surfaced area to the front of the dwelling house, extending north from the existing hard surfaced area, together with all associated works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
To protect and enhance the established amenity of existing residential communities.

Objective set by the Leitrim County Development Plan 2023-2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
36 Shannon Cove, Dromod, LeitrimJul 2025€378,00023 m
2 Shannon Cove, Dromod, LeitrimNov 2025€421,00068 m
13 Shannon Cove, Dromod, LeitrimMay 2026€365,00076 m
Apt E1, Shannon Cove, DromodMay 2025€195,00084 m
Apt 1 Block B, Shannon Cove, DromodAug 2025€212,000150 m
Apt 2 Block D, Shannon Cove, DromodJul 2025€210,000156 m
Apt 1 Block D, Shannon Cove, DromodJun 2025€210,000156 m
7 Shannon Haven, Dromod, LeitrimJan 2026€352,500178 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 November 2021
  2. Decision due13 January 2022
  3. Decision issued12 January 2022
  4. Appeal submitted8 February 2022
  5. Appeal decided11 May 2022
  6. Permission expiry10 May 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.