Planning Permission Ireland
Awaiting decisionInfrastructureDecision was due 1 April 2019

townlands of Killeen Ballyvogue, Cowpark Curraghchase North and Boherboy, Kilcornan Co. Limerick.

Road improvement works on a 750m stretch of the N69 in Kilcornan.

198000 · Limerick County Council · Lodged 31 January 2019

Reference
198000
Authority
Limerick County Council
Register status
In progress
Type
PERMISSION
Received
31 January 2019

Summary

AI-generated

The project involves reducing the N69 carriageway width to 6.5m over a 750m length to install a new footway, kerbing, and grass verge. It also includes LED public lighting, drainage improvements, and accommodation works near the local national school and GAA club.

Infrastructureroadworksinfrastructurelighting

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed improvement works will be carried out within the existing 60kph speed limit zone over a length of 750m between l6135 curraghchase junction and the l6125 junction. The improvement works proposed comprise a reduction of the n69 carriageway width to 6.5m over the 750m length of the scheme with a footway installed on the southern side (school side) and kerbing and a grass verge on the northern side of the carriageway. The proposed works also include for the installation of led public lighting on the northern side of the carriageway, road lining and signage as well as surface water drainage along both sides of the n69 carriageway and pavement improvement works. Accommodation works will be undertaken as required including improvement works in and around the community hub of the national school and gaa club grounds. The implementation of the works proposed will result in a rearrangement of the existing road network in the vicinity of the scheme. Changes to the existing road network will include the reduction of road width to 6.5m over a 750m length and the installation of a kerbed footway abutting the westbound carriageway and kerbing and a verge abutting the eastbound carriageway over the scheme length

Key dates

Timeline

  1. Application received31 January 2019
  2. Decision due1 April 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.