Planning Permission Ireland
RefusedEnergyDecided 14 January 2022

Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe, Co. Limerick

A 10-year permission for a major solar farm spanning approximately 141.8 hectares across four land parcels.

211565 · Limerick County Council · Lodged 12 November 2021

Reference
211565
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
12 November 2021

Summary

AI-generated

The development consists of a solar photovoltaic farm with 755,000 sqm of ground-mounted panels on steel frames. The project includes inverter/transformer stations, underground cabling, security fencing, and internal access tracks across four land parcels.

Energysolarrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; north parcel(gortnakistin townland) approximately 23.78 hectares, central parcel(ballyvalode & keeloges townlands) approximately 43.49 hectares, south central parcel(gortyvahane and moanroe townlands) approximately 34.7 hectares, south parcel(garryduff, moanroe, moanoola and kilmacogue townland) approximately 39.27 hectares. The central parcel, south central parcel and south parcel are collectively referred to as the main solar farm; a route corridor of 0.58 hectares for an underground internal network cable along the r507 and l5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; new internal access tracks; associated drainage infrastructure; site entrances to the r507 public road(site entrance to main solar farm) and the l5040 public local road(north parcel); cctv cameras and all associated site services and works. Works for the internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 560 metres on the r507 regional road, approximately 100 metres on the l5040 local road and approximately 1,260m within the solar farm lands. As part of a separate strategic infrastructure development(sid) planning application provision of a 110kv electrical substation with electrical control building, associated compound with palisade fence and 2no. Overhead line masts, which is to be located within the main solar farm, will be lodged with an bord pleanála in due course. A natura impact statement (nis) will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received12 November 2021
  2. Decision due15 January 2022
  3. Decision issued14 January 2022
  4. Appeal submitted14 February 2023
  5. Appeal decided6 July 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.