Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe, Co. Limerick
A 10-year permission for a major solar farm spanning approximately 141.8 hectares across four land parcels.
211565 · Limerick County Council · Lodged 12 November 2021
- Reference
- 211565
- Authority
- Limerick County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 12 November 2021
Summary
AI-generatedThe development consists of a solar photovoltaic farm with 755,000 sqm of ground-mounted panels on steel frames. The project includes inverter/transformer stations, underground cabling, security fencing, and internal access tracks across four land parcels.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; north parcel(gortnakistin townland) approximately 23.78 hectares, central parcel(ballyvalode & keeloges townlands) approximately 43.49 hectares, south central parcel(gortyvahane and moanroe townlands) approximately 34.7 hectares, south parcel(garryduff, moanroe, moanoola and kilmacogue townland) approximately 39.27 hectares. The central parcel, south central parcel and south parcel are collectively referred to as the main solar farm; a route corridor of 0.58 hectares for an underground internal network cable along the r507 and l5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; new internal access tracks; associated drainage infrastructure; site entrances to the r507 public road(site entrance to main solar farm) and the l5040 public local road(north parcel); cctv cameras and all associated site services and works. Works for the internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 560 metres on the r507 regional road, approximately 100 metres on the l5040 local road and approximately 1,260m within the solar farm lands. As part of a separate strategic infrastructure development(sid) planning application provision of a 110kv electrical substation with electrical control building, associated compound with palisade fence and 2no. Overhead line masts, which is to be located within the main solar farm, will be lodged with an bord pleanála in due course. A natura impact statement (nis) will be submitted to the planning authority with the application
Key dates
Timeline
- Application received12 November 2021
- Decision due15 January 2022
- Decision issued14 January 2022
- Appeal submitted14 February 2023
- Appeal decided6 July 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted260 m away
A 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated…
Ballyvalode , Near Oola , Co. Limerick
22313667LimerickLodged 27 May 2022Infrastructure
- Granted380 m away
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing…
Portnane , Pallasgreen , Co. Limerick.
20941LimerickLodged 18 Sept 2020New dwelling
- Granted420 m away
Demolishing of flat roofed area at rear of existing dwelling. Removal of existing front door, replaced with a…
Ballyvalode , Oola , Co. Limerick.
18352LimerickLodged 12 Apr 2018Extension
- Granted440 m away
The construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and…
Portane , Pallasgreen , Co. Limerick
2360467LimerickLodged 30 Jun 2023New dwelling
- Granted460 m away
Construction of a domestic garage and ancillary works
Portane , Pallasgreen , Co. Limerick
21496LimerickLodged 16 Apr 2021Extension
- Granted480 m away
Construction of a dwelling house, site entrance, and install a packaged waste water treatment system with…
Portane , Pallasgreen , Co. Limerick.
181246LimerickLodged 19 Dec 2018New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The development will consist of: a 10-year permission for the development of a solar farm on a site of c. 143…
The Townlands of Knocknacaheragh Lacka East Rea Trien Pilgrimhill and Shronebeirne , east of Kilmorna , County Kerry
2460605KerryLodged 26 Aug 2024
- GrantedEnergy
Develop at this site within the Townlands of Morett, Killone, Cappakeel, Rossmore and Raheennahown north, Co.…
Townlands of Morett Killone , Cappakeel Rossmore and Raheennahown North , Co. Laois.
2560148LaoisLodged 24 Mar 2025
- GrantedEnergy
A ten year permission and 35 year operation life for a solar farm described herein. The total site area for…
Towlands of Rathdrinagh Sicily Thomastown , Rahill Drumman & Knockcommon , near the town of Duleek Co Meath
23576MeathLodged 1 Jun 2023
- GrantedEnergy
The development consists of a 10 year permission and 35 year operation for a solar farm on two sites: North…
Milltown & Moyagher Lower , Cortown , Kells Co Meath
21396MeathLodged 2 Mar 2021
- RefusedEnergy
A ten year permission for a Solar PV Energy Development with associated Battery Energy Storage System on a…
Cookstown Great , Kells , Co. Meath
2560014MeathLodged 20 Dec 2024
- Awaiting decisionEnergy
A 10 year planning permission for a solar development on a 42.2 ha site consisting of: Three site entrances…
Barnanalleen and Lisheennamalausa , Co Tipperary
21968TipperaryLodged 5 Jul 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.