Planning Permission Ireland
GrantedEnergyDecided 18 September 2025

Townlands of Morett Killone, Cappakeel Rossmore and Raheennahown North, Co. Laois.

Development of a large-scale solar farm across 249 hectares in Co. Laois.

2560148 · Laois County Council · Lodged 24 March 2025

Reference
2560148
Authority
Laois County Council
Register status
Decided
Type
PERMISSION
Received
24 March 2025
Residential units
1
Floor area
1 m²

Summary

AI-generated

Permission is sought for a solar farm with a 40-year operational life across five land parcels. The development includes ground-mounted solar panels, electrical skids, internal tracks, bridge crossings, and site entrances.

Energysolarrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Develop at this site within the townlands of morett, killone, cappakeel, rossmore and raheennahown north, co. Laois. The development will consist of a 10-year permission and 40-year operational life for a solar farm on 5 no. Land parcels as described herein: west parcel (a) (morett townland), central west parcel (b) (morett & cappakeel. Townlands), centre parcel (c) (morett & cappakeel. Townlands), centre east parcel (d) (cappakeel townland) and east parcel (e) (rossmore townland). The total site area for the proposed development is c. 249 hectares and consists of the following; c. 1,796,838sq. Metres of solar photovoltaic panels on ground mounted steel frames; 44 no. Hardstandings for electrical skids and storage; underground power and communication cables and ducts; c. 22,753m. Of boundary security fencing; c. 12,915m. Of new and existing internal access tracks including 2 no. Open span bridge crossings; associated drainage infrastructure; 5 no. Site entrances which include the upgrading of 2 no. Access points onto the l3930, 1 no. New access point onto the l7815 local road and 2 no. New access points onto the l3930 local public road; 5 no. Temporary construction compounds; landscaping and biodiversity enhancement measures and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 7,189 metres in length along the solar farm lands including 4 no. Horizonal directional drilling points to traverse the dunrally stream and the local roads l3930, l3901 and l3817. A separate planning application will be made to an bord pleanála as part of a strategic infrastructure development (sid). This will include the provision of a 110kv substation with electrical control building and ancillary electrical infrastructure, associated compound with palisade fence which is to be located in the west parcel (a) in the townland of morett. The substation will connect to the national grid via. A lilo grid connection onsite. This planning application will be lodged with an bord pleanála in due course. A natura impact statement (nis) has been prepared in respect of the proposed development and accompanies this planning application.

Key dates

Timeline

  1. Application received24 March 2025
  2. Further information requested16 May 2025
  3. Further information received29 July 2025
  4. Decision due22 September 2025
  5. Decision issued18 September 2025
  6. Appeal submitted15 October 2025
  7. Appeal decided16 February 2026
  8. Permission expiry15 February 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.