RefusedInfrastructureDecided 9 May 2024

Roadstone Barrigone Quarry, in the townland of Glenbane East, Askeaton

Infilling and restoration of a 17.2-hectare quarry void using inert soil and stone in Askeaton.

23294 · Limerick County Council · Lodged 6 June 2023

Reference
23294
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
6 June 2023

Summary

AI-generated

The project involves restoring and infilling a 17.2-hectare quarry void with approximately 4.4 million tonnes of inert soil, stone, or river dredge spoil. The site will operate either as an EPA-licensed soil recovery facility or under Article 27 by-product notifications.

Infrastructurequarrysoil recoveryrestoration

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of: (a) the restoration and infilling of the existing and future void over an area of (c. 17.2 ha) of existing permitted quarry (05/7029 and abp
  • Qc. 2098) using approximately 2,464,000m3 or 4,435,200 tonnes of inert soil and stone material or stone by-product, or river dredge spoil. (b) the development will consist of the restoration of the void with either: (1) inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the epa; or, (2) soil and stone by-product (i. E. Essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the epa as an article 27 by-product at its source of origin and transported as a by-product material to enable the site to be restored. The site would then operate under conditions of planning. (c) the proposed development will utilise the permitted quarry infrastructure including internal roads, site office, weighbridge, wheel wash, welfare facilities and other ancillaries to complete the works. (d) stockpiling of topsoil removed during quarrying for future implementation of a restoration plan. (e) construction of a soil inspection shed (approximately 120m2 in area, 4m height) and refuelling area (hardstanding) located to the west of the existing site office (approximately 16m2 hardstanding area. (f) decommissioning and disposal of existing fuel tanks at an appropriately licensed offsite waste facility. (g) associated minor works to include site access road improvements (resurfacing), upgrade of drainage infrastructure including new fuel/oil interceptor and surface drains on hardstanding. (h) existing weighbridge and wheel wash upgrades. (i) demolition of other buildings/structures. An environmental impact assessment report (eiar) and natura impact statement (nis) accompanies the planning application. The development comprises an activity that may require a waste license

Key dates

Timeline

  1. Application received6 June 2023
  2. Further information requested28 July 2023
  3. Further information received15 March 2024
  4. Decision due9 May 2024
  5. Decision issued9 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.