Planning Permission Ireland
GrantedInfrastructureDecided 1 October 2025

Barrigone Quarry, Askeaton, Co. Limerick.

Infilling and restoration of an existing quarry void using inert soil and stone.

2560020 · Limerick County Council · Lodged 16 January 2025

Reference
2560020
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
16 January 2025

Summary

AI-generated

The project involves the infilling and restoration of a 4.1-hectare quarry void using approximately 450,000 cubic metres of inert soil and stone. The site will operate either as an EPA-licensed soil recovery facility or under Article 27 by-product notifications, utilizing and upgrading existing quarry infrastructure.

Infrastructurequarryland restorationwaste management
Floor area
41,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A) the infilling and restoration of the existing quarry void over an area (c. 4.1 ha) of existing permitted quarry (05/7029 and abp
  • Qc. 2098) using approximately 450,000m³ or 810,000 tonnes of inert soil and stone waste or soil and stone by-product. B) the development will consist of the restoration of the void with either
  • Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the epa; or
  • Soil and stone by-product (i. E. Essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the epa as an article 27 by-product at its source of origin and transported as a by-product material to enable the site to be restored. The site would then operate under conditions of planning. C) the proposed development will utilise the permitted quarry infrastructure including internal roads, site office, weighbridge, wheel wash, welfare facilities and other ancillaries to complete the works. D) upgrades to the existing weighbridge and wheel wash facilities. E) construction of a soil inspection shed (approximately 120m² in area, 4m height) and refuelling area (hardstanding) located to the west of the existing site office (approximately 16m² hardstanding area). F) associated minor works to include site access road improvements, upgrade of drainage infrastructure including new fuel/oil interceptor and surface drains on hardstanding. G) all ancillary and associated works. The planning application boundary extends to 17.44 hectares. An environmental impact assessment report (eiar) and natura impact statement (nis) accompanies the planning application. The development comprises an activity that may require a waste licence

Key dates

Timeline

  1. Application received16 January 2025
  2. Further information requested11 March 2025
  3. Further information received7 August 2025
  4. Decision due1 October 2025
  5. Decision issued1 October 2025
  6. Grant issued6 November 2025
  7. Permission expiry5 November 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.