Awaiting decisionInfrastructureDecision was due 26 January 2026

Roches Avenue, Raheen Business Park, Limerick.

Construction of a new 110/38kV/MV electrical substation at Raheen Business Park.

25323893 · Limerick County Council · Lodged 26 November 2025

Reference
25323893
Authority
Limerick County Council
Register status
In progress
Type
PERMISSION
Received
26 November 2025

Summary

AI-generated

The project involves removing existing overhead lines and constructing a new substation compound. It includes a 110 kV GIS building, a 38/20 kV GIS building, power transformers, and associated electrical infrastructure.

Infrastructuresubstationgridinfrastructure
Floor area
935 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The construction of a new 110/38kv/mv electrical substation and will include the following elements
  • Removal of four existing 110 kv overhead line timber pole sets (c. 15 m in height) and c. 800m of overhead line conductor
  • Relocation of existing interface transformer
  • Construction of: i. A new substation compound (c. 5,950 sq. M. ) with a 2.6 m high palisade fencing; ii. A new 110 kv gis building with eight 110 kv bays (c. 700 sq. M. ; c. 12 m in height); ili. A new 38 / 20 kv gis building with fourteen 38 kv bays and eighteen mv (20 kv) bays (c. 235 sq. M. ; c. 7 m in height); iv. Two bunded 110 / 38 kv power transformers (c. 5 m in height) with associated electrical equipment; v. Two bunded 38 / 20 kv power transformers (c. 5 m in height) with associated electrical equipment; vi. Three bunded arc suppression coils (c. 4 m in height) with associated electrical equipment; vii. Two new 110 kv double circuit overhead (ohl) line / cable interface end masts (c. 17m in height); vili. One new 110 kv double circuit overhead line (ohl) angle mast (c. 17m in height); ix. One temporary 110 kv overhead line timber pole set (c. 16 m in height); x. Temporary diversion of the existing 110 kv overhead line to the temporary timber pole set (c. 320 m of ohl conductor); xi. Diversion of the existing 110 kv overhead line to the new end masts (c. 510m of ohl conductor); xii. 110 kv underground cabling between the 110 kv gis building and the new line / cable interface end masts; xili. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables and ducts
  • Site development works including provision of access roads, car parking area, lighting, telecommunications, fencing, landscaping, site services including drainage and all other ancillary works

Land-use zoning

What this land is zoned for

High Tech/Manufacturing CampusBP
To provide for office, research and development, high technology, regional distribution/ logistics, manufacturing and processing type employment in a high quality built and landscaped campus style environment.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received26 November 2025
  2. Decision due26 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.