Coolaboy Dromcollogher and, Mundellihy Ballinlongig Cloonmore Tulligmacthomas Cloonpasteen, Co. Limerick.

Construction of a new wastewater treatment plant and a 6.5km outfall pipe to the River Deel, with decommissioning of the old plant.

2560698 · Limerick County Council · Lodged 17 July 2025

Reference
2560698
Authority
Limerick County Council
Register status
In progress
Type
PERMISSION
Received
17 July 2025

Summary

AI-generated

Uisce Éireann is seeking 10-year planning permission to construct a new wastewater treatment plant to serve a population equivalent of up to 1,550. The project includes a 6.5km outfall pipe running primarily along public roads to discharge into the River Deel. The existing treatment plant will be decommissioned and demolished upon completion.

Infrastructureutilityinfrastructurewater

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Uisce éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (wwtp) at coolaboy, dromcollogher, co. Limerick. The proposed development will comprise the construction of a new wwtp to provide treatment capacity for a population equivalent (pe) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the river deel at a location approximately 6.5 kilometres to the northwest of the wwtp. The outfall pipe will be located primarily in public roads in the townlands of coolaboy, mundellihy, ballinlongig, cloonmore and tulligmacthomas. The existing wwtp will be decommissioned and demolished upon completion of the proposed development. The proposed development will comprise: i) development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (fog) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (fft) pumping station; final settlement tank flow split chamber; 2 no. Final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. Ii) development of an esb sub-station, control building, and fuel tank. Iii) provision of approx. 54m of new gravity sewer to direct flows to the new wwtp. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. Iv) provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. V) provision of photovoltaic (pv) panels on the site of the existing wwtp following its decommissioning. Vi) provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in tulligmacthomas. Vii) realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. Viii) all hard and soft landscaping throughout the site, and all associated and ancillary site works. The proposed development will be accompanied by a natura impact statement (nis)

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
North Road, Main Street, DromcollogherJan 2025€90,000197 m
The Square, Dromcollogher, Co LimerickMar 2025€80,000341 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 July 2025
  2. Further information requested9 September 2025
  3. Further information received22 May 2026
  4. Decision due16 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.