Planning Permission Ireland
GrantedInfrastructureDecided 11 September 2025

Waterways Ireland Shannon Navigation, Limerick Navigation Abbey River and Shannon River (center point ITM easting 558124 northing 658029) and Park Canal (ITM Eating 559079 Northing 657734), Limerick City

Five-year maintenance works along the Abbey River, Shannon River, and Park Canal.

2560704 · Limerick County Council · Lodged 18 July 2025

Reference
2560704
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
18 July 2025

Summary

AI-generated

Waterways Ireland is seeking permission for a 5-year maintenance programme along the Shannon Navigation and Park Canal. Works will include the removal of overhanging branches and fallen trees posing hazards to vessels, aquatic weed management, and vegetation clearance.

Infrastructurerivercanalmaintenanceinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development, limerick navigation and park canal 5-year maintenance works along the abbey river and shannon river navigation from quay lock to ardnacrusha tail race junction and the park canal, in the townlands of rebouge, rebouge island, park, monamuck, irishtown, st. Francis abbey, english town, king’s island, corbally, monabraher, co. Limerick. , will consist of essential maintenance works along the shannon navigation and park canal, as outlined in the construction environmental management plan (cemp) submitted with the planning application and in accordance with waterways ireland’s statutory remit comprising of the following
  • Removal from the navigation, along the abbey river and river shannon to the ardnacrusha tail race, overhanging branches and infringing trees (including dead trees) that have fallen over more than 60 degrees out into the navigation channel causing a hazard to passing vessels
  • Maintenance of overgrown vegetation impacting and overgrowing the water portion of the park canal, aquatic weed management as required, and removal of debris and litter
  • Maintenance of the south back drain associated with the park canal
  • Removal of vegetation impacting park canal structures and undertaking necessary physical minor repairs to quay/limerick lock chamber and associated footbridge, troy’s/park lock chamber and park bridge and associated canal or lock wing and quay walls. The proposed works will involve maintenance to, but not altering the materials or the character of protected structures no. 6063 canal footbridge at lock quay and no. 6064 canal quay and lock walls at lock quay. The vegetation works will involve working within close proximity to or within the curtilage of, but not undertaking any works to, rps no. 3478 stone and brick buildings at quay lock, rps no. 3319 lock quay carriage arch, rps no. 6058 o’dwyers bridge and rps no. 3314 athlunkard boat club an ecological impact assessment (ecia) and natura impact statement (nis) accompany the planning application

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Broad St, Limerick, LimerickMay 2025€150,00097 m
5 Long Lane, Sir Harrys Mall, LimerickNov 2025€120,000111 m
Apt 1, 10 Broad Street, LimerickNov 2025€140,000138 m
Apt 2, 10 Broad Street, LimerickNov 2025€140,000138 m
45 Mary St, Limerick, LimerickJan 2025€260,000143 m
44 Mary Street Apartment A, Limerick, LimerickJul 2025€242,000150 m
29 Lock Mills, Grove Island, CorballyJun 2025€220,000173 m
44 Block A, Lock Mills, Grove IslandApr 2026€255,000173 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 July 2025
  2. Decision due11 September 2025
  3. Decision issued11 September 2025
  4. Grant issued16 October 2025
  5. Permission expiry15 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.