within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan, Carrons and Lisbane, Co. Limerick

Construction of a six-turbine wind farm with a 38kV substation and grid connections.

2561003 · Limerick County Council · Lodged 2 October 2025

Reference
2561003
Authority
Limerick County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
2 October 2025

Summary

AI-generated

The project involves six wind turbines with a tip height of 158m and a rotor diameter of 136m. It includes a 38kV on-site substation compound, underground cabling, two grid connection options, and approximately 3.4km of new site access tracks.

Energywind energysubstationinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kv on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and esb entrances. The building will contain a control room, switchgear room, esb room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid connection option a: 2.54km-long 38kv underground cable connection from the on-site substation to the existing carrons substation to the west of the site. Grid connection option b: loop into the existing 38kv onsite overhead line via the proposed 38kv substation. A new temporary site entrance off the l1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the l1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the ahacronane river by an internal site access track to the northwest of turbine t1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an environmental impact assessment report (eiar) and natura impact statement (nis) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of foynes to the wind farm site entrance via l6188, n69, l1222, l1220 and l1219. The applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the renewable energy directive iii (directiv

Key dates

Timeline

  1. Application received2 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.