RefusedEnergyDecided 13 March 2024

Letter Boleybaun Stangaun Greaghnadarragh Corralustia Turpaun Gortnasillagh West Lugmeeltan Leckaun Lisgavneen Treannadullagh Drumcashlagh and Corderry, Drumkeeran, County Leitrim

Construction of a four-turbine wind farm with a 40-year operational life and a 50-metre meteorological mast.

2460008 · Leitrim County Council · Lodged 19 January 2024

Reference
2460008
Authority
Leitrim County Council
Register status
Decided
Type
PERMISSION
Received
19 January 2024

Summary

AI-generated

The development consists of 4 wind turbines with a maximum tip height of 150 metres, permanent hardstands, and foundations. It also includes a 50-metre meteorological mast, a 20kV electrical substation, internal access tracks, and a bottomless bridge culvert across a minor stream.

Energywind energyinfrastructureturbines

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) construction of 4 no. Wind turbines with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind turbines will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) construction of permanent turbine hardstands and turbine foundations. (iv) construction of a bottomless bridge culvert across a minor stream on site (epa river segment code: 26_4053). (v) construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. (vi) installation of one (40-year life cycle) meteorological mast with a height of 50m and a 4m lightning pole on top. (vii) construction of new internal site access tracks and upgrade of a section of existing internal site track, to include all associated drainage. (viii) improvement of existing site entrance with access via the l4282. (ix) development of an internal site drainage network and sediment control systems. (x) construction of 1 no. Permanent 20kv electrical substation. (xi) all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation. (xii) all works associated with the connection of the wind farm to the national electricity grid, which will be via 20kv underground and partially overhead cable connection approximately 6.4km in length to the existing esb corderry 110kv substation in the townlands of letter, greaghnadarragh, stangaun, corralustia, turpaun, gortnasillagh west, lugmeeltan, leckaun, lisgavneen, treannadullagh, drumcashlagh and corderry. (xiii) ancillary forestry felling to facilitate construction of the development. (xiv) all associated site development works including berms, landscaping, and soil excavation. (xv) installation of battery arrays located within container units (2 no. Units) and associated electrical plant for grid stabilisation adjacent to the substation building. (xvi) development of one on-site borrow pit.

Key dates

Timeline

  1. Application received19 January 2024
  2. Decision due14 March 2024
  3. Decision issued13 March 2024
  4. Appeal submitted9 April 2024
  5. Appeal decided19 November 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.