Planning Permission Ireland
GrantedHousing estateDecided 1 April 2026

Barnakyle, Patrickswell, Co. Limerick

Construction of 55 residential units on serviced sites with associated roads and infrastructure.

2561228 · Limerick County Council · Lodged 24 November 2025

Reference
2561228
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION CONSEQUENT
Received
24 November 2025
Residential units
55
Floor area
9410.6 m²

Summary

AI-generated

This application seeks permission consequent on outline permission for 55 residential units on serviced sites. The development will comprise 43 four-bedroom units and 12 two-bedroom units across four house types, including internal roads, open spaces, and a new vehicular access.

Housing estatehousing estatesubdivisioninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

55no. Residential units on serviced sites on the grant of outline permission granted under planning application ref. 25/87 for development at this site: barnakyle, patrickswell, co. Limerick the overall development will consist of: the construction of 55no. Residential units on serviced sites (incorporating 43no. 4-bed units and 12no. 2-bed units, across 4no. House types), internal roads and pathways; car parking; hard and soft landscaping and boundary treatments; open spaces; public lighting; substation; new vehicular and pedestrian access onto r526 road, and all associated site development works including drainage and foul sewer infrastructure works and suds measures

Land-use zoning

What this land is zoned for

Residential Serviced SitesRS
The purpose of this zoning category is to provide an alternative to individuals wishing to build and design their own houses in small towns and villages rather than the open countryside. High quality, low density residential developments are promoted.

National zoning type: Residential, mixed residential and other uses

Objective set by the Patrickswell Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Previously zoned

  • Residential Service Sites - Phase 1 · 2015–2024 plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Barnakyle, Patrickswell, Co LimerickNov 2025€130,000223 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 November 2025
  2. Further information requested26 January 2026
  3. Further information received5 March 2026
  4. Decision due1 April 2026
  5. Decision issued1 April 2026
  6. Grant issued6 May 2026
  7. Permission expiry5 May 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.